

Add to Cart
Over 30 Meters Per Minute High-Speed Stud And Track Forming Machine Full Automatic
1. Description:
Steel Stud & Truss, as an intelligent component of the building system, provides a variety of applications to assemble a sturdy structure easily and quickly.
Lebron-Machinery supports a complete production line of customized steel construction solutions for customers, including Batten, Top Hat and Stud/Track. Our high-performance machines are selected by market leaders in Australia, New Zealand, Korea, UK, and the United States, and these machines are known for the best innovation and technology.
2. Main Technical Parameters
No. | Item | Description |
1 | Suitable Material | Galvanized Steel Strip |
2 | Thickness | 0.6~1.2mm |
3 | Main Power | 5.5KW |
4 | Roller Station | 12 stations |
5 | Roller Material | 45# steel, quenched. Coated with 0.05mm chrome |
6 | Shaft Material | 45# steel, quenched, coated with 0.05mm chrome |
7 | Shaft diameter | 70mm |
3. Workflow:
Uncoiling → Feeding & Guiding → Roll Forming → Hydraulic Punching → Servo Tracking Cutting → Receiving
4. Main Components
No. | Name | Quantity |
1 | 3-Ton Decoiler | 1 Set |
2 | Feeding Guider | 1 Set |
3 | Roll Forming Machine Unit | 1 Set |
4 | Hydraulic Punching Device | 1 Set |
5 | Hydraulic Servo Tracking Cutting Device | 1 Set |
6 | Hydraulic Station | 1 Set |
7 | Receiving Table | 1 Set |
8 | Electric Control Cabinet | 1 Set |
5. Brands of Electrical Appliances
No. | Name & Brand | Brand |
1 | PLC | Germany Siemens |
2 | Frequency Converter | Japan Yaskawa |
3 | Touch Screen | Germany Siemens |
4 | Encoder | Japan Omron |
5 | Other Electrical Accessories | France Schneider |
6. After-Sale Service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.