

Add to Cart
PLC Control Solar Strut Roll Forming Machine made in china New
design 2018
1. Technical Parameter of Solar Strut Roll Forming Machine
Total power required | 19.5 kw |
Dimensions (L*W*H) | 12.3m*1.8m*1.4m |
Overall packing s hipment | One 40ft container |
Working hours per day | 8 to 16 hours |
Set up t ime | 20 min |
Line d irection | Left to right while facing operator panel |
Machine frame | H-BEAM frame |
Variable l ine s peed | 15mtr./min.(not including) |
Material l oading s ystem | Manual |
Accuracy l evel | Profile dimension +/- 0 .5 mm |
Cut length: +/-1.5 -2.0 mm |
2. Description of Solar Strut Roll Forming Machine
Briefly, a solar panel frame roll forming machine produces the
steel channels often used as supporting frames of the solar panel.
There are standard dimensions for common uni strut channels, i.e.
21*41, 41*41 and 41*61 etc. And also there are punching holes
continuously on the bottom of the channels for joints. The
following are some regular joints or connections.
3. Layout of Solar Strut Roll Forming Machine
4. FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
5. After-sell service
A. Foreign debugging
If you need, we will arrange our professional engineers to help you
install and debug the machines well. Buyer should pay $60 per day
B. Guarantee period
The warranty will be maintenance, maintain in the guarantee period
of 18 months starting from delivery. Because of the quality of
equipment during guarantee period, we will provide the parts free
of charges, which is in the conditions of correct operation.
(Natural disasters or factors which can’t forced by human are
excluded).
C. Training
During installation and adjustment of the equipment, our engineers
shall provide the training to
buyer’s personnel request to operate and maintain the equipment.
Including foundation construction, electrical works, hydraulic oil,
safe operation and non-standard safety items, testing material and
etc.