Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color

Brand Name:Lockey
Certification:ISO9001, CE, OSHA ,ATEX
Model Number:LG41
Minimum Order Quantity:5
Delivery Time:1-7 days
Payment Terms:Western Union, L/C, T/T, credit card, paypal
Contact Now

Add to Cart

Active Member
Address: Building D, Tangxian Industrial Zone, North Baixiang Town, Yueqing, Zhejiang, China.
Supplier`s last login times: within 34 hours
Product Details Company Profile
Product Details

Industrial Electrical Safety Lockout Tagout Loto Personal Portable Lockout Kit


Part No.: LG41

Electrical Lockout Kit

  • Made from durable waterproof nylon fabric.
  • Light-weight and easy to carry or wear .
  • Carrying all proper secure safety lockout equipment with small size.

Including:

  • Lockout bag (LB41) 1PC;
  • Safety padlock (P38S-RED) 1PC;
  • Safety padlock (PC175-RED) 1PC;
  • Lockout tag (LT03) 12PCS;
  • Breaker lockout (CBL32) 2PCS;
  • Breaker lockout (CBL31) 1PC;
  • Lockout hasp (SH01) 1PC;

Isolation preparation - specify "device isolation plan"

Identify hazards associated with the equipment to be isolated

Identify the isolation points on the flow meter diagram

Determine how to shut down and decompress equipment

Isolation preparation - energy isolation sheet

Record all isolation points on the energy isolation sheet

The energy isolation sheet shall be kept at the work site together with the work permit.

Isolation preparation - general requirements (according to operating procedures)

All personnel working in isolation must know

The equipment was shut down

The proper place to isolate

Isolate all power sources of a device

Clam preparation - general requirements (according to operating procedure)

Safely empty toxic or flammable liquids and gases

Flammable liquid discharge to the same potential to zero leakage storage area to prevent electrostatic fire

At the first flange nearest to the device to be opened, isolate the processing device

In the process of emptying or relieving the pressure of the process processing equipment, the adjacent area cannot carry out the thermal work.

3.14 The Accident

3.14 the accident

Accident history:

In March 2012, the raw material section of the cement plant was shut down for maintenance. One operator enters the tee at the bottom of the long belt to clean the lumped material, and the next person monitors it. Suddenly the long belt opens and the material falls from above the operator, hitting the operator. On the side of the guardian immediately contact the central control personnel stop, the operator rescued. No injuries were reported.


Cause of accident:

1. During shutdown, the long belt is not power off and not listed.

2. When the central control personnel started up, they failed to check the situation with the on-site personnel.

3. The guardian fails to fulfill the responsibility of safety guardianship. When the belt was opened, it was not detected and stopped in time.

Enlightenment and corrective measures:

1. When all equipment is stopped for maintenance, power must be cut off and listed.

2. During shutdown, the central control shall communicate and coordinate with field personnel to open any equipment, and confirm that the equipment to be opened is unmanned.

3. The safety supervision personnel shall take charge of the supervision and keep in touch with the maintenance personnel and the central control personnel in time.


China Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color supplier

Industrial Electrical Lock Off Kit Safety Lockout Tagout Loto In Red Color

Inquiry Cart 0