Hot Finish SA 179 Hydraulic Cylinder Tube , Seamless Carbon Steel Tubing For Hear Exchanger

Certification:ISO9001, ISO14001, TS16949
Minimum Order Quantity:negotiable
Place of Origin:Zhejiang, China (Mainland)
Price:negotiable
Standard:ASTM, BS, DIN, GB, JIS
Grade:20#, 45#, Q345, St37, St52, St45, St35.8, St37-2, ST35
Contact Now

Add to Cart

Verified Supplier
Location: Jiaxing Zhejiang China
Address: INDUSTRY AREA -HAIYAN ,JIAXING CITY ,ZHEJIANG ,CHINA
Supplier`s last login times: within 29 hours
Product Details Company Profile
Product Details

Hot Finish SA 179 carbon steel pipe for Hear Exchanger


Standard : GB/T3639, GB/T8713, EN10305-1:2002, EN10305-2:2002,
ASTM A519-2006, ASTM A513-2007, GB/T1591-2008, GB/T17396-2009

sa 179 carbon steel pipe
Material: 20#, 45#, Q345B, Q345D, 25Mn, 27SiMn, E355


Type: Hydraulic Cylinder Tube

I.D.: 40-400mm

W.T.: ≥5mm

Length: Up To 12000mm According To Customer's Requirement

Surface Treatment: As Customer's Required
Place Of Origin: Zhejiang, China (Mainland)



Detailed Images


QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.


Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

TORICH Hot Sale Hot Finish SA 179 carbon steel pipe for Hear Exchanger












China Hot Finish SA 179 Hydraulic Cylinder Tube , Seamless Carbon Steel Tubing For Hear Exchanger supplier

Hot Finish SA 179 Hydraulic Cylinder Tube , Seamless Carbon Steel Tubing For Hear Exchanger

Inquiry Cart 0