Carbon Steel Structural Steel Tube Hot Finished Seamless Type 3 - 12m Length

Certification:ISO9001, ISO14001, TS16949
Minimum Order Quantity:negotiable
Place of Origin:Zhejiang, China (Mainland)
Price:negotiable
Standard2:GB/T8162
Grade:10#, 20#, 45#
Contact Now

Add to Cart

Verified Supplier
Location: Jiaxing Zhejiang China
Address: INDUSTRY AREA -HAIYAN ,JIAXING CITY ,ZHEJIANG ,CHINA
Supplier`s last login times: within 29 hours
Product Details Company Profile
Product Details
DIN EN 10210-1 Structural Steel Pipe Carbon Steel Hot Finished Seamless Tube

DIN EN 10210-1
Hot finished structural hollow sections of non-alloy and fine grain steels
Part 1: Technical delivery conditions
Part 2: Tolerances, dimensions and sectional properties
Cold forming:
Process is done at ambient temperature
Structural hollow section manufacturing process:
Structural hollow sections are manufactured by seamless or by welding.
Welded sections manufactured by continuous process.
Electric welded hollow sections are supplied without trimming the internal weld bead.
Delivery condition:
Qualities JR, J0, J2 and K2 - Hot finished
Qualities N and NL - normalized. (normalized rolled)
- for accelerated cooling +DC
- for quenching and tempering +QT
Surface condition:
The hollow sections have a smooth surface corresponding to the manufacturing method used; bumps, cavities or shallow longitudinal grooves resulting from the manufacturing process are permissible, provided the thickness is within tolerance.
End: Square cut
TABLE 1 Permissible deviations of the product analysis from the specified limits of the cast analysis specified

Packing & Delivery

Packing Details : In anti rust protection, in hexagonal bundles of seamless steel tube

Delivery Details : 30-40days

4. Raw Material Stocking- Segregation
5. Packing and Shipment
6. Container Loading and Shipment
Application

The structural steel tubes used for liquid transportation

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time ?

A: It is according to quantity. And usually is 35-50 days after receiving 30% T/T in advance.

Q: How to get the sample of seamless steel tube ?

A:

1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.

Q: What is your terms of payment ?

A:

1.T/T: 30% deposit in advance, the balance 70% paid before shipment

2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation







China Carbon Steel Structural Steel Tube Hot Finished Seamless Type 3 - 12m Length supplier

Carbon Steel Structural Steel Tube Hot Finished Seamless Type 3 - 12m Length

Inquiry Cart 0