Tractor Mounted Piling Pole Erection Machine For Pole Erecting And Digging Application

Brand Name:BAI SHUN
Certification:CE
Model Number:BS-1204
Minimum Order Quantity:1set
Delivery Time:10 working days after received down payment
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Location: Zhengzhou Henan China
Address: No.65, Tianming Road, Jinshui District, Zhengzhou City, Henan Province, China
Supplier`s last login times: within 29 hours
Product Details Company Profile
Product Details

High quality alloy steel bit 100HP tractor mounted piling rig for pole erecting and digging


Product Discription


The bore pile machine is widely used in cement poles digging pile solar panel bracket of solar photovoltaic power generation in the construction engineering, pile, the liquid pressure in the form of a drilling machine, simple and convenient operation, high efficiency. Drilling speed is 5-6 times of another digging machine. The tractor as the power source has good road performance, per drill pipe, the integration of driving and operation.


Technical Data


ModelBS-1204
Drive type4*4
Power120HP
Steering systemHydraulic system
Bit materialAlloy steel
Drill pipe reamer materialManganese steel
Hole diameter(mm)100-2000
Hole depth(mm)100-6000
Overall size(L*W*H) mm7520*2170*2994
Weight(T)7.1
Hoisting machine8T, 10T, 12T
Dig a pit speed(/sec)25-60

Product Main Features


(A) 4 driver wheeled hydraulic drill machine

(B) professional design make the arm of digger more stable

(C) widely use in construction of power facilities.

(D) high efficiency and Save manpower.

(E) main body is YTO tractor, famous brand can search YTO GROUP.

(G) One person operate and one help to fix the wire rod.

(H) Save manpower and with high efficiency.

(I)easy working on the loess layer, clay layer, containing pebbles gravel soil, weathered rock and soil, frozen soil, building garbage, backfill sand, garbage layer.

Pole Erection Machine photos for your reference


Packing & Delivery


Payment terms

We usually use T/T, L/C

T/T:T/T 30% in advance, the balance be paid after inspection before the delivery

Before delivery, we will send you the pictures of finished machines and welcome you to come to our factory for inspection


Way of packing

20/40feet container


Shipping

MSK/MSC/APL/EMC/PIL and so on


Warranty

12 months under normal use except for wearing parts


FAQ

1: Where is your factory located? How can I visit there?
A: Our factory is in Zhengzhou City ,very close to Xinzheng Airport, warmly welcome you to visit our factory, we can pick you up from airport.


2: What’s your main product range?

A. Pole erection machine with tractor crane, post hole digger, etc


3: Can you do OEM?

A: Yes, we can do OEM.


4: We want to be your agent in our local area, how to apply for this?
A: Please send email to us about your ideas, win-win.


5: How about your trade terms and payment terms?
A:Our trade term is EXW,FOB,CFR and CIF.

We accept T/T, Western Union, Paypal and L/C payments terms.


Our Services


1. 24 Hours after sales service by E-mail or Phone.

2. 100% response rate.

3. Engineers available to service overseas.

4. OEM service is available

5. Warranty: 12 months, beyond the warranty period, all spare parts offered to you with factory price.

China Tractor Mounted Piling Pole Erection Machine For Pole Erecting And Digging Application supplier

Tractor Mounted Piling Pole Erection Machine For Pole Erecting And Digging Application

Inquiry Cart 0