Product Details
YIKE GROUP 2750MM CNC Servo Motor PLC Control Thin Blade Slitter Scorer
Machine With Auto Change Order
PRODUCT SPECIFICATIONS
| Auto Thin Blade Slitter Scorer Machine | |
| No | Model | YK-2500 | YK-2750 |
| 1 | No.s of slitting scoring | 4/6 5/8 6/10 |
| 2 | Max.production speed | 180m/min |
| 3 | Max.feeding width | The Max.slitting between the two blades:2250mm | The Max.slitting between the two blades:2750mm |
| 4 | Max.slitting width | 2600mm | 3100mm |
| 5 | Min.slitting width | 200mm | 200mm |
| 6 | Min.feeding length | 200mm | 200mm |
| 7 | Min.scoring distance | 40*135mm | 40*135mm |
| 8 | Gap adjustment | Manual |
| 9 | Main motor power | 10kw | 12kw | |
| 10 | Dimensions L*W*H | 1570*3450*1500mm | 1570*3950*1500mm |
| 11 | Weigh | 2780kg | 2980kg |
Human machine interface —PLC control,The system for robot operating system more humanized, simple structure, easy to maintain.
1.Manual/auto feeder is available
2. Pre pressing roller,slitting blade and scorer holder are auto adjusted
3.Grinding knife is auto/manual
4.Cardboard thickness and press power are auto adjusted(customer required)
5.Jog for fine-adjusted
6.Auto counter
7.Slitting and press line precision ±0.5mm

Auto slitter scorer :
8.Human machine interface —PLC control,cutter paper thin blade change order use stand alone stepper motor control,auto change order speed 1-20S,error precision±0.5 mm.
9. Operation humanized.,no technical content,worker use operation use easy.
10 Slitting part:Adopt high quality tungsten steel thin blade,sharp and long work life,slice more tidy,non-pressing and non-burr.
11.The two sides of thin blade are cut separately by rubber wheel press board,surmount not scorer,separate plate,off tracking ,to prevent the bad effect of straight line.
12.This machine can memory 999 group order,don’t need stop machine can change order and manual change order.
13.QR code change orders





YIKE GROUP Other type carton box making machine






Company Profile
CHINA YIKE GROUP CO.,LTD
was established in January of 2002, which is a high-tech
enterprise, manufacture and sales of high level automatic
corrugated cardboard production line, flexo printer slotter die
cutter machine, Casemaker.
Our Group implement the ISO 9001-2008, in strict on factory
management. All products series pass CE certification.
YIKE GROUP. with professional technology, serious management, and
advanced equipment, we provide high quality products and timely
aftersale service.
We devote to be the World leading partner of the corrugated
packaging industry, more than 200 machines running in customer
sites in UK, Italy, Spain, Saudi arabia and so on. Thousands
machines in China domestic market.
Yunxiang carton machinery factory Co., Ltd. wish to achieve
resplendence with you hand in hand, shoulder to shoulder in the
future.
cangzhou yike carton machinery manufacturer.
Any inquirement, pls contact with us asap.
Thanks.
Anna Tang
Email: Anna@yikegroup.net
Wechat/whatsapp: 008613363699514
