

Add to Cart
Cold Bending Galvanized C Channel Steel For Solar Energy Systems
C-section purlin is mainly used for commercial applications, but it is also suitable for smaller type garages and carports.
Adopting advanced galvanizing technology, make the appearance of beautiful, has the property of anti corrosivewear-resisting,increasing the utilization rate of the product and service life.
The related products of solar energy support system are made of
carbon steel and stainless steel. The surface of carbon steel is
galvanized by hot dip galvanizing. It has been used outdoors for 30
years without rust. The solar photovoltaic support system is
characterized by no welding, no drilling, 100% adjustable and 100%
reusable.
Technical Parameters:
Usage | Construction |
Place of Origin | Henan, China |
Application | Decoration, building or construction |
Material | Stainless Steel, Q235,Carbon steel or SS304 or SS316 |
Standard or Nonstandard | Custom-made |
Technology | Hot dip galvanized |
Process | Punching / Machining: Cutting, punching, drilling, milling, bending, welding, CNC etc |
Specification | Steel c purlin, c channel, c channel steel price |
Thickness | 1.2mm,1.5mm,2.0mm,2.5mm,2.7mm,customized |
Length | 3meter/6meter or according to customer's requirement |
Size | 41x41/41x21/41x61/35x18/40x22/50x30mm or according to customer's requirement |
Hole size | 13x30, 12x40, 11x38, 24x12, 28x12mm |
Color | Customers' Demand |
Size | All kinds based on your needs |
Lengths | According to Customer's Requirements |
Thickness | 1.0mm--3mm |
Quality | Toppest steel raw materials,skilled workers to provide good quality products |
Shape | U channel or C channel |
Packaging | In Bundles and fasten with steel strips or by wooden pallets |
Features:
1. We can make adjustment to meet your inquiries as we can do.
2. Manufactured from high tensile galvanized steel
3. Pre-punched holes based on detail design.
4. C purlin may be used in single spans and continuous spans in
multi-bay buildings.
5. Completeassessories package available.
Application:
Packaging & Shipping:
► Place of loading: Basic Seaport, China
► Payment Terms: L/C,D/A,D/P,T/T
► Package: strong and long distance transportation package
► Delivery Detail: Delivery time:7--25 days after receiving customer’s deposits
Our Certificates: