

Add to Cart
ComFlor® 210 has very effective cross stiffener technology and the deep profile shape provides a very efficient metal deck and composite slab, with a low usage of concrete. Slimflor systems have wider lower flange steel beams that allow the deck to land on the bottom flange.
Efficient - low use of steel and concrete.
Versatile – top or bottom flange application.
Nestable profile gives low transport and handling costs.
Specifications:
Name | steel decking formwork |
Base material | Hot Dipped Galvanized Steel Sheet |
Steel Grade | SGCC |
Yield strength | Q235 or Q345 Refer to Standards GB/T1591-2008 |
Thicknes | 0.8 -1.5mm(normal 0.8,1.0,1.2) |
Zinc coating | 60-275g/m2 |
Wave Height | 51mm-76mm |
EffectiveWidth | 688mm-940mm |
Length | 0-11.8m |
Less than 5.8m load in 20GP | |
5.8m-11.8m load in 40GP | |
Packing | Bundle ,water-proof package with steel belt |
Delivery time | 20 days after confirmation |
Following are some of typical profiles available in market:
| YXB51-200-600 |
YXB65-186-558 | |
YXB60-253-760 | |
YXB60-180-540 | |
YXB51-200-600 | |
YXB65-186-558 | |
(2) Opened type galvanized steel floor decking | YX75-230-690 |
YX75-200-600 | |
YX38-152-915 | |
YX51-305-915 | |
YX76-305-915 | |
YX75-230-690 | |
YX75-200-600 | |
YX51-250-750 | |
YX51-335-1005 | |
YX76-344-688 | |
(3) swallow tail galvanized steel floor decking | YX51-200-600 |
YX51-190-760 | |
YX51-200-800 | |
YX51-200-600 |
Advantages:
Greater Durability
The FAMOUS steel base product has a Z350 zinc-coating mass. It was
selected to provide superior corrosion protection in service,
directly as a result of increased coating mass. FAMOUS steel is
also available with a Z450 coating mass with a 15 year warranty.
Comprehensive shear stud welding tests across a range of base
thickness with both coating masses were undertaken to ensure
consistent results can be achieved on site.
Unbeatable Strength
Steel and concrete composite slabs are lighter and stronger than
most conventional slabs. The steel decking provides tensile
reinforcement, combining with the compressive strength of the
concrete for an all round stronger slab. Steel decking profiles are
designed to prevent any longitudinal slip between the steel and
concrete in the slab itself, and any transverse movement between
the slab and supporting beams.
Greater Savings
The weight savings achieved in composite slabs can be passed on to
other areas of the design, such as foundations. And because steel
decking acts as permanent formwork, it can significantly reduce the
need for propping or temporary formwork -saving both time and
money.
Easy On-Site Handling
Steel decking is delivered to site in pre-cut lengths, and in
pre-packaged bundles. The bundles can be easily craned into work
areas, and the individual sheets quickly layed by hand. One truck
can carry 1,000 sq metres of decking at a time, and a team can
install up to 400 sq metres in a day.
Speedy, Safe Construction
A composite slab effectively acts as a safe working platform. Once
the slab is poured, following trades can get on with their jobs
below almost immediately. At the same time, work can continue
unhindered on the floors above, allowing simple installation of
services. Cable trays, ductwork and service pipes can be suspended
neatly underneath the slab with purpose designed clips, brackets
and hangers that locate easily and quickly into recesses in the
steel decking profile.
To complete our floor decking products we advise a complete floor slab construction by adding the supply and laying of reinforced concrete. This single point solution allows a fully integrated metal deck and concrete slab with associated trade interface and program advantages.
Composite slab which is comprised of lightly reinforced concrete cast on profiled steel decking are an option whether the beams are downstand or integrated within the slab depth for a shallow floor form of construction. The slabs are normally reinforced using an upper layer of mesh and, sometimes additional bars in the troughs (usually for longer periods of fire resistance and heavy loads). Fiber reinforcement may also be used. Spans of up to 4.5 m can be achieved using trapezoidal decking. Some so-called deep decking profiles also exist (over 200 mm deep), that can span 6 m or so without propping during construction.
While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.
The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.
So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.
Following are some typical detail:
Warmly welcome various clients from International market to enquiry and visit us!