Silent Hydraulic Hammer Pile Driving For Spun Pile Square Pile Foundation

Brand Name:T-works
Certification:CE,GOST
Model Number:ZYC280
Minimum Order Quantity:1 unit
Delivery Time:30-45 days
Payment Terms:L/C, T/T, D/P, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Changsha Hunan China
Address: No,21,Yongyang Road, Liuyang Hi-tech Industrial Development Zone, Changsha, Hunan, China 410323
Supplier`s last login times: within 22 hours
Product Details Company Profile
Product Details

T-works Hydraulic Pile Driving Machine for Spun and Square Pile foundation


1, Description:

ZYC series hydraulic static pile driver is a new environmentally friendly pile foundation construction equipment with a number of national patents. It has the features of no pollution, no noise, no vibration, and fast pile driving, high quality pile. It is represent the future development tendency of pilling machinery.


2, Applications:


  • No limitation on pile length. Suitable for construction in clay soil, soft soil and sand bed foundation, or in the Karst areas with low earth covering, or by riversides, or in coastal areas with deep bearing stratum.

  • No noise, No pollution during construction, especially suitable for operations in areas with noise control such as schools, social communities, and urban areas.

  • No vibrations. Suitable for vibration-control areas such as subways, overpass, dangerous buildings, precision instrument buildings and those nearby banks.

3, Specifications:


Parameter/ModelZYC280
Rate piling pressure(KN)2800
Piling speed(m/min)Fast7.7
Low1.8
Piling stroke(m)1.9
Pace(m)Longitudinal2.4
Horizontal0.6
Angle range(°)15
Rise stroke(m)1.0
Square pile(mm)Max500
Circle pile(mm)Max500
Side piling(mm)900
Corner piling space(mm)1800
Lifting weight(t)12
Pile hanging length(m)14
Power(KW)Piling60
Lifting30
Main dimension(m)Work length12
Work width6.1
Transpot height3.1
Total weight(t)280

4, Features of Hydraulic static pile driver:


1)Civilized construction; Clean; No noise; No vibrations; No construction wastes.
2)Reliable Construction Quality; Piling process is similar to static load testing, where pile bearing force can be displayed. 100% pile success rate is guaranteed.
3)Fast piling and High efficiency; One HSPD can drive piles in total of 600~800m per 8 hours, much faster than other modes. Especially suitable for large-scale or time-constraint projects.
4)Walking and steering freely. Easy to align piles.
5)Compact conformation. Easy to disassemble & assemble.


China Silent Hydraulic Hammer Pile Driving For Spun Pile Square Pile Foundation supplier

Silent Hydraulic Hammer Pile Driving For Spun Pile Square Pile Foundation

Inquiry Cart 0