Add to Cart
Low-e tempered explosion-proof glass glazing curtain wall design
The inside construction will be the same in any case.An ample
assortment of profiles ensures that
construction with this complete facade system can be designed and
built,The most divergent facade
solutions are possible in terms of design,anti-theft,fire
resistance and(hidden) movable parts.All profiles
are processed at the factory and only need to be installed at the
site.
Glass Curtain Wall |
Tempered glass is to heat glass up to 700 degrees and then rapidly cool down, according to different degrees; there are two kinds of this glass: full tempered glass and half tempered glass. |
|
1. Tempered glass is a kind of safe glass and the fragment of which does no harm to people. |
2. It's 4-5 times safer and harder than ordinary annealed glass. |
3. Special logo and pattern can be printed on tempered glass. |
4. Outstanding performance in resisting thermal stress and wind-load. |
5. Bear sudden temperature change of 220 centigrade degree |
Guangzhou Apro Building Materials Co. Ltd(APRO) is professional in design,
developing, manufacturing, installing, after-sale service alumiunium products.
APRO is an icon with the meaning of young, energetic, professional, international vision.
With technical expertise and high quality service, our mission is to building a professional
servicing to customer and providing one stop service for building
material Business.
FACTORY WORKSHOP
WORKSHOP SHOWROOM
Site Masurement Redesign Solution
Manufacturing Site Installation
Plywood Paking wth forklift area Loading container Loading
container
Q1 ARE YOU TRADING COMPANY OR MANUFACTURER?
We are factory.
Q2 WHAT IS YOUR PRICE?
Price is based on buyers’ requirements:
a. Shop drawings or window schedule to show the windows&doors
opening styles, dimensions and quantities.
b. Aluminum colors.
c. Type of glass.
Q3 HOW LONG IS YOUR DELIVERY TIME?
FYR
For the series in stock 15 workdays with 300 m2.
For the series out of stock 50 workdays with 700 m2.
Q4 WHAT IS YOUR TERM OF PAYMENT?
Less than 5 000 USD, 100% payment in advance.
More than 5 000 USD, 40% in advance, the balance before loading.