Add to Cart
Quality Control:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing or Cold Rolling, On line inspection
5. Heat Treatment
6. Straightening/Cutting to specified length/Finished Measuring
Inspection
7. Quality Testing in own lab with Tensile Strength, Yield
Strength, Elongation, Hardness, Straightness, etc.
8. Packing and Stocking.
100% Eddy Current Testing.
100% Size Tolerance Checking.
100% Tube surface checking to avoid surface defects.
Product Name | 20G Superheaters and Pressure Vessel Low Carbon Seamless Boiler Tube |
Material | 12Cr1Mo1VG,20G,12CrMoG,15CrMoG |
Delivery Condition | Heat Treatment |
Standard | GB5310 |
Application | Heat Exchanger, Condensers and similar heat transfer apparatus |
Certificate | ISO 9001 |
HS code | 7304319000 |
Delivery Time | 45 days |
Packing | Bundles or Wooden Boxes |