Add to Cart
Xi'an JW Import and Export Co., Ltd. gathers the most outstanding textile spare parts manufacturers, aiming to become the leading textile spare parts and service supplier of loom spare parts, dobby spare parts, jacquard spare parts and so on in the Chinese textile manufacturing industry.
Our main spare parts: Projectile compelte,gripper,body,Projectile feeder ES,Projectiel feeder plate,RH-opener ES,Projectile feeder link,special rivet,special screw,Bush,RH_lever,Projectile feeder MS, Upper and lower gripper, RH_bar,RH-opener,Nut,Centering blade ,Weft end gripper,,Weft end gripper body,Tucking needle,Picking shoe,Picking link,Picking lever,Projectile returner,Slide plate,
FAS opener, Scissor, Roller,Brake band,Projectile lifter,Camplate, Projectile lifter upper part,Projectile guide block ES,Upper guide ,Expellor fork,Selector,Oil level glass with O-ring,Pinion shaft Z=13,Cutting device with scissors driven FA/SU,KSA shaft,Handle,Temple,Brake lining,Switch wheel Hub 28/25, Wrap beam bearing FA/SU,Ratchet 2:60,Tennex pin,Dolla,Globoid wheel Z=48,Chanin wheel,Clutch lining,Camdisc 40,Work gear,Spring conveyor,Steel healds,eyelet,angle disk,Dumpig bush,Weft tension lever,guide tooth block,,brake lining ,Weft sensor etc.
Shipping Date | 3-5 Working Days After Payment |
---|---|
Port of Loading | China |
Packaging | Carton |
Shipment | TNT/FEDEX/UPS/DHL |
MOQ | 10 Piece |
Warranty | 6 Month |
Terms of Payment | L/C,T/T.Paypal, Western Union,Credit Card |
Loom Type | Sulzer Projectile Loom |
Product | Sulzer Loom Spare Parts, Projectile Feeder Guide Piece, Weight 13g |
1.What is your payment term?
-T/T,Western Union,and Paypal.This is negotiable.
2.What is the shipping method?
-It could be shipped by sea,by air or by express(UPS,DHL,TNT,FEDEX and ect). Please confirm with us before placing orders.
3.Do you supply after-sales services?
-We supply after-sales services for our parts.
4.How is your warranty for the parts?
-For our parts, we supply six month warranty.
5.When will you arrange the shipment?
-For small order, we need 3-5 working days to prepare the goods.
-For large order, we need 7-15 working days to prepare the goods.