Home /Heat Insulation Materials /

Rack And Pinion Heavy Payload Construction Site Elevator SC250BG KP-B19

Rack And Pinion Heavy Payload Construction Site Elevator SC250BG KP-B19

Brand Name:KANGBO
Certification:TUV
Model Number:SC250BG KP-B19
Minimum Order Quantity:1 set
Delivery Time:30 days afterd receipt of down payment or L/C
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Xiamen Fujian China
Address: Rm. 704, No. 30, Binglang Dongli, Siming District, Xiamen, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Construction site hoist rack and pinion high speed heavy payload SC250BG KP-B19


Production and Materials
KANGBO implements the true modular design of rack and pinion hoists, standardization and fine processing of lifts parts and components, and assembly line production.

The construction elevator components are standardized and universal.
Main structure frame are made of 16Mn and Q355B high strength cold roll steel plate, cut by laser, process by CNC machines in tool fixtures, welded by robots.
The construction lift cage roof is made of one piece of steel plate, and its edges are totally welded by robot, to ensure never water leakage and high strength of the elevator car.


Standard Configuration
There is a small crane for conenient installation of the elevator.
In single cage configuration.
The construction site rack and pinion type elevators are Variable Frequency Drive (VFD), with low starting current, very smooth starting/stopping and so there is much less wear and tear.


Technical Data

Item & Article No.SC250(BG) KP-B19
Payload Capacity2,500 KG per Cage
Lifting Speed0–80 m/min with full load
Max. Lifting Height250/450 m*
Cage Size (internal)3.2(Length)*1.5(Width)*2.35(Height) Meter per Cage
Motor ControlFC control
Engine Power3x38 KW per Cage
GearboxHelical Reducer
Safety Device TypeCentrifugal Brake
Power Supply Range380–500 V, 50 or 60 Hz, 3 Phase
Type of MastSquare Column 650*650 mm with Bolted Rack
Length Mast Section1.508 m
Rack Module8
* Increased lifting height on request. 400 m with step-up/step-down transformer.
Optional Configuration
Power SupplySlide Contact Line System (Busbar)
Floor SelectionMulti-functional Control System (Floor selector, Automatic Landing, Error Detection and Display, etc.)
TUV proved according to European Regulation EN 12159:2012, EN 60204-1:2006/A1:2009.

China Rack And Pinion Heavy Payload Construction Site Elevator SC250BG KP-B19 supplier

Rack And Pinion Heavy Payload Construction Site Elevator SC250BG KP-B19

Inquiry Cart 0