Bridges Chimney Q345B Steel 36 M / Min Construction Site Lift

Brand Name:KANGBO
Certification:TUV, CCC
Model Number:Construction Site Lift SC200BD MP-B05 SC200-200BD MP-B06
Minimum Order Quantity:1 set
Delivery Time:25-30 days
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Xiamen Fujian China
Address: Rm. 704, No. 30, Binglang Dongli, Siming District, Xiamen, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Bridges / Chimney Q345B Steel Construction Site Lift


Construction Site Lift Features


1. Due to the strict raw material procurement control system, our construction hoist lift is guaranteed with safe and reliable performance.


2. The steel, electrical components, hoist cables, high strength bolts and spare parts are all introduced from well-known international and domestic suppliers.


3. The CNC cutting blanking production line ensures the accurate size of the accessories.


4. Structural parts are welded with argon gas shield so as to keep welding quality and prolong the lifespan of the passenger hoist.


5. The cold-formed steel is adopted to ensure the quality and stiffness of the steel plate. The strengthened steel structure design successfully reduces the risk of structural deformation.


6. The surface of the building equipments is treated with polyurethane paint and anti-salt-spray paint. The main parts and accessories are hot-dip galvanized and sprayed with plastics. Hence, the anticorrosion ability of the construction lifting equipment is improved so that its service life is effectively extended.


7. The rigorous and dependable detection means effectively ensure the comprehensive performance of the equipment.


Construction Site Lift Standard Configuration


There is a electrical small crane available to facilitate the assembly of the construction elevator.
There is the additional 'C' door at cage side for convenient loading/unloading.
Available in single or twin hoist cage configuration.
The construction rack and pinion elevators are Variable Frequency Drive (VFD), with low starting current and much less wear and tear, very smooth starting and stopping.
Manual or Automatic Controls of the hoist is optional.
There is LED lighting inside construction elevator car.
The construction material hoist cage roof doors are equipped with Interlock.
Equipped with hoist drop test facility with remote control.
A frequency control unit (FC), with closed-loop, be equipped.


Construction Site Lift Technical Data


Item & Article No.SC200BD, MP-B05; SC200/200BD, MP-B06 Construction Site Lift
Payload Capacity2,000 KG per Cage
Lifting Speed0–36 m/min.
Max. Lifting Height450 m
Cage Size (internal)3.2(Length)*1.5(Width)*2.35(Height) Meter per Cage
Cage Doors3 doors, Entry Door + Exit Door + Side Door
Motor ControlFC (Frequency Control)
Engine Power2x11 KW per Cage
GearboxHelical Gearbox
Safety Device TypeCentrifugal Brake
Power Supply Range380–500 V, 50 or 60 Hz, 3 Phase
Type of MastSquare Column 650*650 mm with Bolted Rack
Length Mast Section1.508 m
Rack Module8

China Bridges Chimney Q345B Steel 36 M / Min Construction Site Lift supplier

Bridges Chimney Q345B Steel 36 M / Min Construction Site Lift

Inquiry Cart 0