Piston Structure Pump Concrete Block Making Machine For Building Thermal Insulation

Brand Name:KEMING
Certification:CE, MA
Model Number:KFP Concrete Block Making Machine
Minimum Order Quantity:1 Set
Delivery Time:5~8 Work Days
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Zhengzhou Henan China
Address: No. 17 Fengyang Street, Zhengzhou City, Henan Province, China
Supplier`s last login times: within 13 hours
Product Details Company Profile
Product Details

Piston Structure Pump KFP Concrete Block Making Machine for Building Thermal Insulation

KFP Concrete Block Making Machine Features:

1. KEMING KFP Series Cement Foaming Machine combines feeding machine, water adding device, mixing system, foaming system, delivery system together.

2. It is convenient to operate, automatic cement feeding, automatic mixing of cement slurry, automatic foaming of foaming agent, automatic delivery of foaming concrete.

KFP Concrete Block Making Machine Technical Parameters:

ModelCapacity m3/hPressure MpaPower KWDelivery distance m
KFP-65-20A10-121.57.5100/20
KFP-65-40A10-121.5,37.5200/40
KFP-76-20A18-201.511100/20
KFP-76-40A18-201.5,411200/40
KFP-90-20A38-401.515100/20
KFP-90-40A38-401.5,515200/40

KFP Concrete Block Making Machine Application:

1. KEMING KFP Series Cement Foaming Machine combines feeding machine, water adding device, mixing system, foaming system, delivery system together.

2. It is convenient to operate, automatic cement feeding, automatic mixing of cement slurry, automatic foaming of foaming agent, automatic delivery of foaming concrete.



FAQ


---Foam Concrete Pump. Cement Foaming Machine

1. Q: Which model should we choose?

A: To recommend the most suitable model, please tell us:

- Material: cement, cement&sand, or other materials

- Capacity (-m3/h) :

- Max aggregate size (-mm) :

- Volume weight (-kg/m3) :

- Delivery distance (horizontally / vertically) :


2. Q: Do i need technical skills to operate this machine?

A: Yes. Please read the Operation Instruction for some basic technical skills before operating this machine, and contact us if any operation procedure is unclear.


3. Q :How to pay for this order?

A: Generally, TT, 30% deposit 70% before shipment;

L/C at sight (high bank charge, not suggest, but acceptable);

100% TT in advance (especially for small amount and spare parts etc.)

China Piston Structure Pump Concrete Block Making Machine For Building Thermal Insulation supplier

Piston Structure Pump Concrete Block Making Machine For Building Thermal Insulation

Inquiry Cart 0