Arm Robot Shotcrete Machine Used To Big Project Tunnel Building

Brand Name:KEMING
Certification:CE,MA
Model Number:KPC-80
Minimum Order Quantity:1 Set
Delivery Time:5~10 Work Day
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Zhengzhou Henan China
Address: No. 17 Fengyang Street, Zhengzhou City, Henan Province, China
Supplier`s last login times: within 13 hours
Product Details Company Profile
Product Details

Arm Robot Shotcrete Machine Used To Big Project Tunnel Building

Shotcrete Machine Features:

1. KPC-80 Shotcrete robot is suitable for spraying dry concrete, wet concrete or wet and dry mixture.

2. The machine adopts independent hydraulic drive and 4 hydraulic legs, greatly improving the stability of the equipment during the spray process.

3. It adopts explosion-proof electrical design, which makes it acceptable in underground coal mine.

4, It is equipped with unique protective cover, which can protect the robot arm.

Shotcrete Machine Application:

1. KPC-80 Shotcrete robot is an ideal equipment for any working space, even in narrow tunnel construction.

2. It is widely applied in mining well, railway, hydropower station, urban construction and other engineering constructions.

3. It can be used for slope stability (slope stability), excavation and support, shotcrete support of big project tunnel building, coal mine or power station construction.

Shotcrete Machine Parameters:

Parameter
Dimensions in transport mode (L*W*H)
4500*1080*2200 mm
Weight
3000 kg
Maximum length of operation
8400 mm
Outrigger expansion width
2500 mm
Boom parameters
Maximum spraying height
8.2m
Maximum spraying width
11m
Hose ID
51mm/57mm/64mm
Boom frame telescopic distance
2.7m
Boom expansion maximum length
6m
Chassis
Maximum gradient of walking
25 %
Ground slope of working
2%
Walking speed
0.5km/h
Ground clearance
390 mm
Power
Motor output of Hydraulic system
11 kW
Voltage
660~1140V
50Hz

China Arm Robot Shotcrete Machine Used To Big Project Tunnel Building supplier

Arm Robot Shotcrete Machine Used To Big Project Tunnel Building

Inquiry Cart 0