ASME 16.9 Nickel Alloy Straight Tee Butt Welding 1/2" STD High Pressure Equal Tee

Brand Name:TOBO/ METAL
Certification:BV/ SGS/ TUV/ ISO
Model Number:Tee
Minimum Order Quantity:1 PC
Delivery Time:15workdays
Payment Terms:Western Union, L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: No.208,Lvdi Road,Baihe Town,Qingpu District,Shanghai,China
Supplier`s last login times: within 34 hours
Product Details Company Profile
Product Details

ASME 16.9 Nickel Alloy Straight Tee Butt Welding 1/2" STD High Pressure Equal Tee

Product Description

Porduct NameTee
BrandTOBO
Size1/2"-100",SCH5S-SCH160S,XS,XXS,STD
StandardANSI B16.9, EN10253-2, DIN2605, GOST17375-2001, JIS B2313, MSS SP 75, etc.
Heat TreatmentNormalizing, Annealing, Quenching Tempering
RadiusLR/long radius/R=1.5D,SR/Shrot radius/R=1D, Various radius: 2.5D, 3D, 5D, 10D, 20D etc.
Surfacenature color, varnished, black painting, anti-rust oil etc.
MaterialCarbon steel: A234WPB, A420WPL6 St37,St45, E24, A42CP, 16Mn, Q345, P245GH, P235GH, P265GH, P280GH, P295GH, P355GH etc.
Pipeline steel: WPHY42, WPHY52, WPHY60, WPHY65,WPHY70, WPHY80 and etc.
Cr-Mo alloy steel: P11,P22,P5, P9,P91, 10CrMo9-10, 16Mo3 etc.
ApplicationPetrochemical industy;avation and aerospace industry;pharmaceutical industry;
gas exhaust;power plant;ship buliding;water treament,etc.
Advantages1. Corrosion Resistance
2. Heat Resistance
3. Heat Treatment
4. Welding
5. Machining
Product show

Why Choose Us?

1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products export to Africa, Oceania, mid east, eastern Asia, Western Europe etc.


Packing & Shipping

Packaging Details: Pallet/Wooden Case or as per your Specification


Delivery Detail: Shipped in 30 days after payment


FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.


Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 50% T/T in advance ,balance before shippment.

China ASME 16.9 Nickel Alloy Straight Tee Butt Welding 1/2 STD High Pressure Equal Tee supplier

ASME 16.9 Nickel Alloy Straight Tee Butt Welding 1/2" STD High Pressure Equal Tee

Inquiry Cart 0