ASTM A671 Gr.CC65 Hot Dip Galvanized Tube ERW Certificate Plain / Threaded End

Brand Name:METAL
Certification:SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED
Model Number:ASTM A671 Gr.CC65
Minimum Order Quantity:1PC
Delivery Time:5-8WORK DAYS
Payment Terms:L/C, D/A, T/T, Western Union, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: No.208,Lvdi Road,Baihe Town,Qingpu District,Shanghai,China
Supplier`s last login times: within 34 hours
Product Details Company Profile
Product Details

3inch Sch40 Carbon Steel Seamless Hot Dip Galvanized Tube ASTM A671 Gr.CC65


Quick Details


Standard: JIS, ASTM, API, GB

Standard2: JIS G3445-2006, ASTM A106-2006, API 5CT, API 5L, GB/T 9711.3-2005

Grade Group: A53-A369, 10#-45#, Q195-Q345, ST35-ST52

Grade: A53(A,B), 10#, Q235, Q215, St37, St52

Thickness: 8 - 6

Section Shape: Round

Outer Diameter(Round): 21.3 - 273

Place of Origin: China (Mainland)

Application: Structure Pipe

Technique: ERW

Certification: ISO9001

Surface Treatment: Galvanized

Special Pipe: Hot Dip Galvanized Steel Pipe, Pre-Galvanized Steel Pipe

Alloy Or Not: Non-alloy

Product name: galvanized steel pipe class b

Brand Name: Renyun erw galvanised steel pipe

Zinc Coating: 60g/m2-600g/m2

Pipe End: Plain End or Threaded, Punch, Shrink, Extension etc.

Pipe Length: 3-12m

Secondary Or Not: Non-secondary

Payment: T/T, L/C, West Union, Money Gram, Cash etc.

OEM Service: Support

MOQ: 1 Ton

Samples: Free


Product NameHot Dip Galvanized Tube
Pipe Length

Single Random Length and double Random Length.

SRL:3M-5.8M DRL:10-11.8M or As clients requested length

Wall thicknessSCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS
StandardAPI5L , ASTM A106 Gr.B, ASTM A53 Gr.B, ASTM A179/A192 GB5310-2009, GB3087-2008,GB6479-2013, GB9948-2013, GB/T8163-2008, GB8162-2008,GB/T17396-2009
SurfaceCarbon steel seamless pipes :Rust-proof black painting
Payment termT/T, L/C at sight, etc
Delivery Time10-40 days
Applications1.Fluid pipe
2. Power Plant
3. Structure pipe
4. High and low pressure Boiler tube
5. Seamless steel tubes for petroleum cracking
6. Conduit pipe
7. Scaffolding pipe pharmaceutical and ship building etc
CertificateAPI5L ISO 9001:2008 TUV SGS BV etc
Main MarketAsia, Middle East, Europe, America, Africa, Australia, etc
End treatmentUnder 2 inch plain end. 2 inch and above Beveled
High Temperature Seamless PipeASTM A106 Gr. B/C, API 5L Gr. B, ASTM A53 Gr. B
Heat Exchanger Seamless TubeASTM A179
Low Temperature Seamless PipeASTM A 333 GR. 6
Low Temperature Seamless TubeASTM A334 Gr. 6
High Yield Seamless PipeAPI 5L Gr. X42/X46/X52/X56/X60/X65/X70/X80 PSL-1/PSL-2
High Yield Seamless PipeISO 3183 Gr.L245, L290, L320, L360, L390, L415, L450, L485
Atmospheric & Low Temp EFW PipesASTM A671 Gr. CC60/CC65/CC70

Company Information


We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicians.

We have five branch factories which can supply the best quality pipes, tubes, fittings flanges and related accessories. Now, it owns a number of advanced pipe production equipments, metal, forging, machining, cold forming, hot extrusion, such as heat treatment process, producing 60, 000 tons of pipe fittings. Company with a variety of detection devices, such as nondestructive testing, chemical analysis, metallographic examination, physical experiments. The technical is very strength, our main products contain fittingsforged socket welding fittings and threaded fittings, pipe weld and the materials of the products contain stainless steel ,duplex-stainless steel alloy steel.


APPLICATION



FAQ


Q:Are you trading company or manufacturer ?

A: We are factory.


Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.


Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shipment.


China ASTM A671 Gr.CC65 Hot Dip Galvanized Tube ERW Certificate Plain / Threaded End supplier

ASTM A671 Gr.CC65 Hot Dip Galvanized Tube ERW Certificate Plain / Threaded End

Inquiry Cart 0