Wireless Remote Control Electric 2 Ton Jib Crane With A3 - A4 Working Duty - dowellcranecn

Wireless Remote Control Electric 2 Ton Jib Crane With A3 - A4 Working Duty

Brand Name:Dowellcrane
Certification:ISO CE BV CCC GOST SGS
Model Number:Jib Crane
Minimum Order Quantity:1 Set
Delivery Time:15 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Xinxiang Henan China
Address: Economic Development Area, XinXiang city, Henan province, China.
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

Industrial Mobile Wireless Remote Control Electric 2 Ton Jib Crane


Product Description


Industrial Mobile Wireless Remote Control Electric 2 Ton Jib Crane is a lifting device used with chain hoists and CD electric hoists. It has the characteristics of simple operation, reliable operation and convenient maintenance. Widely use the upper and lower materials of the user's workshop machine and the process, the workpiece lifting of the production line and other occasions.



Code of practice for jib crane

  • Before starting the cantilever crane, please carefully check whether the mechanical equipment, electrical parts and protective safety devices are intact and reliable. If the crane controller, brake, limiter, bell, emergency switch and other main accessories fail, it is strictly prohibited to lift the weight.
  • must obey the signal man's command, but for the emergency stop signal given by anyone, should stop immediately.
  • the driver must confirm the command signal before the operation, should start the bell.
  • when close to the winch limit, car close to the terminal or adjacent to the car encounter, the speed should be slow. The crane is not allowed to use reverse instead of brake, stop switch instead of limit, emergency switch instead of ordinary switch.
  • Walk and get up and down on designated safe corridors, special platforms or escalators. It is not allowed to walk on both sides of the track except for maintenance. It is forbidden to walk on the trolley track. Do not cross from one crane to another.
  • When the work stops, do not hang heavy objects in the air. During operation, the bell should sound when the ground is manned or the lifting part is dropped. It is forbidden to cross the person's head. Objects shall not be lifted too high from the ground.
  • two gantry crane lifting a thing at the same time, to obey the command, in step.
  • During operation, a certain distance should be kept between the bridge crane and the bridge crane.
  • Maintenance bridge crane should lean against a safe place, cut off the power supply, and hang up the warning sign of "no and gate". The ground should be fenced and "no access" signs hung.
  • When lifting heavy tonnage objects, it is necessary to lift them slightly off the ground to make sure that the gantry crane has stable hanging and good braking, and then raise them and run slowly. Do not operate three control handles at the same time.

Package & Delivery


China Wireless Remote Control Electric 2 Ton Jib Crane With A3 - A4 Working Duty supplier

Wireless Remote Control Electric 2 Ton Jib Crane With A3 - A4 Working Duty

Inquiry Cart 0