Home /Food & Beverage Machinery /

50 Times PP Building Plastic Formwork Machine , Concrete Making Machine

50 Times PP Building Plastic Formwork Machine , Concrete Making Machine

Brand Name:ACEMIEN
Certification:CE
Model Number:ASM-01
Minimum Order Quantity:1 set
Delivery Time:60 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Address: No.2,Changhong Road, Modern Agriculture Demonstration Park, Zhangjiagang City, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

50 Times Reusable PP Building Plastic Formwork For Concrete Making Machine

Plastic formwork is an important tool for concrete structure construction. In the cast-in-place concrete structure project, the formwork project generally accounts for 20% to 30% of the cost of the concrete structure project, accounting for 30% to 40% of the engineering labor cost, accounting for about 50% of the construction period. PVC plastic building formwork technology directly affects the quality, cost and efficiency of engineering construction, so it is an important part of promoting the progress of building technology. Investing in PP plastic building formwork and formwork equipment production line is one of the outstanding projects for the development of small and medium-sized enterprises.


At present, your country is in the period of industrial and civil building infrastructure construction and development. The building is mainly composed of reinforced concrete, and the construction formwork is an indispensable material and important tool. The current construction market has become closer to transparency.


Cost comparison of PP formwork(915mm width) and wooden(bamboo plywood) formwork for 3 buildings construction:


Type


Cost

PP construction formworkWooden(bamboo plywood) formwork
Cost of the first building7500×$15=$112,500

Overground:7500×$4.5=$33,750

30 floors need at least 3 batches, the cost is $33,750×3=$101,250

Under ground:1000×3×$3=$9,000

Total cost:$110,250

Cost of the second building

1.The same type, use ratio100%, cost 0

2.The different type, use ratio70%, cost

7500×$3.7(trade-in price)×30%=$8,325

The same with the first building $110,250
Cost of the third buildingThe same with the second building $8,325The same with the first building $110,250
Total cost of three buildings

$112,500+$8,325+$8,325=129,150

The PP formwork can be recycled,

the recycling price is $4.5/sheet, 7500×$4.5=33,750

Actual cost: $129,150-$33,750=$95,400


Actual cost: $110,250×3=$330,750

The cost of using PP formwork is 29% of traditional wooden(bamboo plywood) formwork


Project evaluation:

Product size: 915(W)×1830(L)mm, 13-16mm Thickness

1220(W)×2440(L)mm, 13-16mm Thickness


It can be customized by clients

Product weight(915width): 14mm----13.5±0.5kg/sheet

15mm----14±0.5kg/sheet

16mm----15±0.5kg/sheet

About 8kg/㎡



China 50 Times PP Building Plastic Formwork Machine , Concrete Making Machine supplier

50 Times PP Building Plastic Formwork Machine , Concrete Making Machine

Inquiry Cart 0