1800 Rpm Vibroflotation Technique For Offshore Stone Column Construction

Brand Name:BVEM
Certification:ISO 9001:2015
Model Number:BJZC-BFS-400-180
Minimum Order Quantity:1
Delivery Time:30 work days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Beijing Beijing China
Address: Songzhuang Country , Tongzhou District , Beijing , China
Supplier`s last login times: within 25 hours
Product Details Company Profile
Product Details

China BVEM 180kW bottom feed vibroflot equipment for offshore stone column construction


The Bottom Feed Electrical Vibroflot Spec.
TypeBJZC-BFS-400-180
Power(kW)180
Voltage(V)380
Frequency(Hz)50
Rotation speed(rpm)1200-1800
Working pile diameter (mm)900-1200
System pressure(bar)6
Vibration force(kN)200-300
Hopper volume(m³)1.2
Pipe diameter(mm)DN250
Control typeInverter Control
Cooling-down methodCirculating water cooling
Air flow rate(m³/min)10
Vibrator size L/W/H(mm)2600×600×700
The bin size L/W/H(mm)4800×1300×(1300-1500)
Extension tube size L/W/H(mm)12000×300×600
Weight (Standard part+Extension tube) (ton)9+3×n

Characteristic (Bottom feed vibroflotation device barge type)


Bottom feed vibroflotation device barge type effectively solves the construction problems faced by underwater Vibroflotation Gravel Pile Construction in the following aspects:


a) Construction platform problem: underwater construction needs to form construction space through cofferdam construction, otherwise it is necessary to set up construction platform or configure construction barge on the water surface.

b) Supporting equipment: due to the particularity of underwater construction, it is necessary to configure a large number of complex special supporting tools and equipment suitable for underwater construction.

c) The process of pile and stone delivery under water must be an effective problem. In the previous underwater construction cases using the traditional vibroflotation method, due to the existence of the above problems, the vibroflotation construction cost is higher, the efficiency is low, and the construction quality is difficult to guarantee.


Application


HongKong Immigration artificial island project of Hongkong- Zhu Hai-Macao Bridge




Main equipment : bottom feed vibroflot, ship frame,materials ship and excavator.

Construction : more than 46000 piles have been formed, total 1.1 million linear meters


Tiba Bay New Container Port Project in Timor Leste



Construction : from - 15m underwater, max working depth 26m, pile diameter 1m, more than 14,000 piles have been formed, adopted Automatic pile positioning system(RTK system)

China 1800 Rpm Vibroflotation Technique For Offshore Stone Column Construction supplier

1800 Rpm Vibroflotation Technique For Offshore Stone Column Construction

Inquiry Cart 0