Light Frame Q235B Pre Engineered Steel Warehouse Steel Factory Buildings

Brand Name:Ruly Steel
Certification:SGS, BV, ISO
Model Number:Ruly0280
Minimum Order Quantity:500 Square Meter
Delivery Time:30 Days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: Tieshan Industrial zone, Huangdao District, Qingdao City.
Supplier`s last login times: within 40 hours
Product Details Company Profile
Product Details

Light Frame Pre-Engineered Steel Warehouse Steel Factory Buildings


Project Information:

Prefabricated steel structure factory building mainly refers to, the main load-bearing components are composed of steel, processed in advance.Including steel columns, steel beams, steel structure foundation, steel roof truss (of course, the span of the workshop is relatively large, basically all steel structure roof truss), steel roof, pay attention to the wall of steel structure can also be maintained by brick wall.


Steel structure workshop construction plan (partial frame) content introduction

First, steel structure installation procedures

Installation of steel column → installation of support between columns → temporary position of steel crane beam → roof beam and roof support → correction and fixation of steel crane beam, etc. → installation of maintenance structure

Second, steel column installation

(1) Due to the large weight and length of the steel column, it is impossible to make and transport the steel column at one time. Therefore, the method of segmented production and on-site assembly is adopted to make the steel column as a whole and then hoisting is carried out. It is proposed to make the steel column in two sections.The steel column is divided into two sections, the lower lattice section and the upper H-beam section, which are transported to the site.The weight of the steel column is about 6 tons, and the position height is about 17 meters. The truck crane of 50 tons can meet the lifting demand, and then a truck crane of 25 tons can be used for lifting.

(2) Lifting using single machine rotary lifting.Before lifting, wood should be padded at the position of the steel column foot plate, so as not to damage the column foot plate in the process of lifting.When the steel column is hoisted, the crane should hook up and turn the arm at the same time to make the steel column vertical off the ground and put the column into the mouth of the cup.


Main PartsItem NameSpecification




Main Steel Frame

Steel Column
Q235B, Q355B
H shape, Box, Steel pipe, Hot rolled sheet

Steel Beam
Q235B, Q355B
H shape, Steel Truss, Hot rolled sheet

Brace
Q235B, Q355B
Steel rod, Steel pipe, Angle steel
Roof PurlinC or Z shape, Steel purlin



Supporting System

Wall Purlin
Q235B, Q355B
C or Z shape, Steel purlin
RoofSingle colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,
WallSingle colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,





Accessories
BoltsOrdinary, High strength
GutterGalvanized Steel plate, Stainless steel
WindowsAluminum alloy-Glass, Aluminum alloy-shutter, PVC
DoorsSliding or Rolling door
DownpipesPVC pipe, Color steel pipe
Edge CoverMade of color steel sheet thickness 0.5mm
VentilatorStainless steel
CraneCrane in 5 tons to 30 tons

Display of steel structural members


China Light Frame Q235B Pre Engineered Steel Warehouse Steel Factory Buildings supplier

Light Frame Q235B Pre Engineered Steel Warehouse Steel Factory Buildings

Inquiry Cart 0