Add to Cart
Galvanized steel pipe easy to install durable material outdoor playground with bright colors TQ-CB1293
As we all know, the operational financing in the planning and
design stage directly affects the quality of product service and
the experience of visitors after the opening of the theme park. In
the demand for financing of many professional operating conditions,
the demand for special operating conditions in the queuing area of
amusement equipment is particularly important. We have learned
that whether it is engaged in the operation of the park or as a
tourist to visit the park, it is easy to find in the playground.
The amusement equipment queues the most visitors, everyone queues
in each equipment area to play equipment. . Even some large roller
coasters, for a three- or five-minute experience, have to queue for
two or three hours. Especially in the tourist season, most of the
time spent playing in the queue.
Therefore, the design of the queuing area is not good, and it is
unreasonable. The operating conditions need not be funded, which
directly affects 80% of the experience of more than 90% of tourists
coming to the park. Then, what kind of operational demand
conditions should be considered in the queuing area of a theme
park's amusement equipment, and how should we design a queued
product with high quality of operational services? We have studied
and compared the queuing areas of many well-known parks at home and
abroad, and summarized 30 operating conditions.
1. Passenger flow statistics
It is used to count the reception volume of each device. The common
methods are divided into gate statistics and monitoring statistics.
Generally set at the entrance and exit of the queuing area.
Consider the design of strong and weak power in advance.
2, the passenger channel
That is to say, the basic queue line of the tourists, the queuing
passage leading to the amusement equipment and the passages of the
tourists who have experienced the equipment and walked out of the
equipment area.
3, alternate channel
Also known as the peak day channel or the alternate channel, that
is, the channel that is enabled when the peak day visitors are
many, exceeding the normal reception volume of the passenger area.
4, fast channel
It can also be used as a VIP channel or a fee-based service channel
to reach the access zone of the equipment on the shortest distance.
5, barrier-free access
A wheelchair access that is available for disabled people.
6, employee channel
That is, the channel designed for the employees to enter and exit
the queuing area and the equipment area along the queuing area. It
is used to deal with emergency events and sanitation in queuing
areas. Can be used with the fast channel, provided that the two
channels are adjacent.
7, alternate channel
Also known as the peak day channel or the alternate channel, that
is, the channel that is enabled when the peak day visitors are
many, exceeding the normal reception volume of the passenger area.
8, evacuation channel
It is also called the emergency channel, that is, the channel that
can be quickly evacuated when the emergency exit is opened in the
queuing area, and can be used together with the employee channel or
the fast channel, provided that these channels are adjacent.
9, monitoring points
It is necessary to fully monitor the coverage of the equipment
queuing area.
10. Emergency exit
We have learned that an emergency exit should be set every 20-30
meters, which is convenient for tourists to evacuate from the
queuing area to a safe place in the event of an emergency, or to
change the idea to leave the queuing area.
11, adjustment port
Also known as the interval point, when responding to different
passenger flows, adjust the position of the moving line in the
queuing area. Usually a chain or gate type.
12, trash can point
Generally, the queuing area exceeding 50 meters should consider
placing the trash can in the queuing area. The placement point
should be determined in advance, and the corresponding queuing area
should reserve space, that is, control the construction length of
the queuing area. Can not affect the passage of tourists.
13, water supply and drainage points
Landscape design tends to neglect the need for cleaning and rinsing
in the outdoor park queuing area. Therefore, when there is
insufficient greening water point around the long queue area of
large equipment, the water supply point should be reserved near
the queuing area.
14, TV point
In general, the large-scale amusement equipment queuing area should
consider installing a TV set, which is used to broadcast the park's
promotional videos, equipment safety instructions, and programs for
playing the relief of tourists' long queues of irritability, as
well as installing some body games, such as cutting fruits and
racing cars. Inductive games, looping out.
15, broadcast point
The China Amusement Equipment Information Network Information
Network reminds you that the broadcast console must be in the
operation room to facilitate the manipulation of the content. The
broadcast should cover the range of the passenger and passenger
channels, and the broadcast of the passenger and passenger channels
should be controlled separately.
16, lighting and emergency light points
Large-scale parks should be open to the evening for a certain
period of time, so it is necessary to consider the setting of the
location of emergency evacuation lights after night operation
lights and power outages.
17, the foggy system point
The point used for the installation of erupting water mist
equipment is also used for the summer high temperature cooling
effect of the queuing area tourists.
18, information release point
For example, the electronic display screen of the large equipment
queuing area entrance, the waiting time in the queuing area is
reported to the screen point.
19. Shade and non-shade areas
Shading is divided into indoor or semi-indoor queuing areas with
buildings and areas with awnings.
20, temporary seat
It is arranged for the temporary rest of tourists in the middle of
the long queue area. There are fixed platform type and automatic
folding type.
21, halfway back to the point
For a large equipment queuing area with a length of one hundred
meters, the return point is usually set in the middle to the down
passenger channel. Therefore, to install a one-way gate at this
point, it can only enter and prevent the tourists from entering the
queue.
22, safety railings
China Amusement Equipment Information Network learned that the fast
track is temporarily opposite to the regular passenger channel, and
the railing of the connecting part between the two channels is
higher than the railing of the queuing area. Under normal
circumstances, the height of the railing in the queuing area is
1000mm, then the height of the safety railing is 1100mm.
23, skid plate
For the indoor play equipment queuing area, a skid plate is usually
installed at the entrance.
24, safety net area
That is to say, the large-scale equipment running line passes
through the upper area of the queuing area, and the safety net is
designed to prevent the falling objects from falling into the
queuing area.
25, railing profiles
Most of the railings in the country are stainless steel, galvanized
pipes or iron railings. Regardless of the material, it is
recommended to use a round material. It is not recommended as a
square tube. Because of the angularity, it is very easy to hurt
tourists if it is bumped.
26. Shelter area
That is, the maternal and child area or the child area, because the
equipment ride is limited. When you are away from home, this area
is convenient for visitors who are not waiting for equipment.
27, railing style
The state stipulates that the safety railings around the equipment
area must be vertical poles. It is also recommended that the
railings in the queuing area be the same, which can effectively
prevent tourists from going up and down.
28, the queuing area identification point
The layout of the entrance and exit signs and safety warning signs
and the emergency evacuation signs should be set off against the
theme culture of the equipment.
29, selling points
In the middle of some large amusement equipment queuing areas, it
is sometimes necessary to consider setting up small-sized trucks to
facilitate tourists to purchase water, food and specialty goods.
30. Interactive area
Long queues for large equipment can take into account the settings
of the interactive space or interactive stage. Used in interactive
performances such as clowns to ease the irritability of long
queues.
In short, we remind you that only by operating the financing and
planning and design, it is a good product to design a product that
meets the operational needs.
Measurements (mm) | 840*640*455cm(L*W*H) |
Safety Area (mm) | 1140*940cm(L*W) |
Certificate | ISO9001, SGS,CE |
Modules | Roofs, slides, plastic panels, stairs, decks, tubes and posts, climbing. |
Material | A. Plastic parts: Imported LLDPE |
B. Post: National standard galvanized steel pipe | |
C. Metals: Galvanized | |
D. Deck, stair, bridge: Steel with plastic covered | |
E. Fasteners: 304 stainless | |
(Different material is available at your demand. ) | |
Advantage | a.Anti-UV |
b.Anti-static | |
c.Security | |
d.Environmental protection | |
e.Color is not easy to fade | |
Installation | 2 day (2 persons) |
Falling Height (mm) | 2200 |
Age Range | 3--12 age |
Capacity | 10-20 persons |
Apply to | Amusement park, kindergarten, preschool, residential area. |
Packing | Standard export packing |
Plastic parts: Bubble bag and pp film; | |
Iron parts: Cotton and pp film | |
Delivery Volume:18CBM | |
Use Life | 7-10 years |
Remark | 1.Please check the screws and other catchers regularly to assure the firm structure. |
2.Please make sure that all the kids play with adult supervision. | |
3.Blunt objects and acid corrosive liquor are forbidden. |