Cold Steel Roll Former RainWater Downpipe Gutter Forming Machine

Brand Name:shitong
Certification:CE/ISO9001
Model Number:400
Minimum Order Quantity:1 set
Delivery Time:30 days
Payment Terms:L/C,T/T
Contact Now

Add to Cart

Verified Supplier
Address: No. 1 Road, Economic developing zone, Botou City, Hebei province, China
Supplier`s last login times: within 13 hours
Product Details Company Profile
Product Details
Cold Steel Roll Former RainWater Downpipe Gutter Forming Machine
1. Product Overview: Specialized for Rainwater Downpipe/Gutter Production

This Cold Steel Roll Former is engineered exclusively for manufacturing rainwater downpipes and gutters, focusing on high efficiency, precision, and durability to meet the demands of construction and plumbing industries. It adopts cold roll forming technology—processing PPGI (pre-painted galvanized steel) into standardized, seamless downpipe/gutter profiles without high-temperature treatment, preserving the material’s structural integrity and surface finish.

As a new, factory-fresh piece of equipment, it complies with ISO and CE certifications, ensuring adherence to international quality and safety standards. With a production capacity of 8-12m/min (extendable to 10-16m/min based on configuration), it supports high-volume output for large construction projects or batch supply to hardware retailers. Its versatile design also allows customization of feeding width and profile specifications, adapting to different regional downpipe/gutter size standards (e.g., circular downpipes, rectangular gutters).

2. Quick Details & Core Technical Parameters
2.1 Quick Details
Quick DetailSpecific Information
Warranty2 Years (comprehensive coverage for core components)
Machine TypeTile Forming Machine (specialized for downpipe/gutter cold roll forming)
Production Capacity8-12m/min (standard); 10-16m/min (adjustable via configuration)
CertificationISO, CE
ConditionNew
Processed MaterialSteel (PPGI as primary raw material)
Primary UseRainwater downpipe and gutter production
Place of OriginHebei, China (Mainland)
Voltage380V (compatible with industrial power grids)
Dimension (LWH)8*1.2*1.5m (space-efficient layout for factory installation)
Weight6T (robust build for long-term heavy-duty operation)
Roller Material45# Steel (high strength, wear-resistant for repeated forming)
Customizable ColorAvailable as per customer request (matching PPGI material or brand aesthetics)
Control SystemPLC (intelligent digital control for parameter setting and process monitoring)
Cutting Blade MaterialCr12 Mov (high-hardness alloy steel, ensures sharp, clean cuts)
Processable Thickness0.3-0.8mm (covers common PPGI thicknesses for downpipes/gutters)
Cutting TypeMould cutting (precision cutting to set lengths, no burrs on cut edges)
Raw MaterialPPGI (pre-painted galvanized steel, corrosion-resistant for outdoor use)
2.2 Detailed Technical Parameters
Parameter CategorySpecifications
Feeding WidthCustomizable (as per customer order, adapting to different raw material widths)
Forming Thickness0.3-0.8mm (consistent with PPGI material standards for downpipes/gutters)
Forming Rows/Stations14 rows (gradual forming to ensure seamless, uniform pipe/gutter profiles)
Shaft Material45# Steel (tempered for enhanced toughness, anti-deformation during power transmission)
Shaft Diameter70mm (thickened design for stable roll rotation and load-bearing)
Roller Material45# Steel (machined with high precision to match downpipe/gutter profile requirements)
Blade MaterialCr12 (heat-treated for durability, maintains sharpness for long-term cutting)
Driving ModeChains + Gear (stable transmission, low noise, minimal power loss)
Forming Speed10-16m/min (adjustable based on material thickness and profile complexity)
Cutting PrecisionMould-based (ensures cut lengths match set parameters, tolerance ≤ ±1mm)
3. Core Machine Components & Functions

The complete production line consists of 5 key components, working in tandem to realize end-to-end downpipe/gutter manufacturing:

No.Component NameFunction Description
1Manual UncoilerStably unrolls PPGI coils (raw material) to ensure continuous, uniform feeding to the forming system; prevents coil loosening or tangling.
2Main Forming MachineCore component for cold roll forming: uses 14 rows of rollers to gradually shape flat PPGI sheets into downpipe/gutter profiles (e.g., circular, rectangular); ensures consistent wall thickness and profile symmetry.
3Computer Control CabinetHouses the PLC control system: allows setting of forming speed, cutting length, and production quantity; monitors real-time operation status and triggers fault alarms (e.g., material jam, power fluctuation).
4Power & Pump StationProvides power for the entire machine: drives roller rotation via the main motor, and supplies hydraulic pressure for the cutting system; ensures stable power output during continuous operation.
5Hydraulic Cutting UnitUses Cr12 Mov blades and mould cutting technology to cut formed downpipes/gutters to set lengths; supports non-stop cutting to match forming speed, avoiding production bottlenecks.
4. Cooperation Terms: Warranty, Packaging & Delivery
4.1 Warranty & After-Sales
  • Warranty Period: 2 years from the date of delivery. Within the warranty period, any damage to core components (e.g., rollers, shafts, PLC) caused by quality defects will be repaired or replaced free of charge.
  • Lifelong Support: Beyond the warranty, we provide technical consultation, spare parts supply (at cost price), and on-site maintenance services (customer covers engineer travel/accommodation) to ensure long-term machine operation.
4.2 Packaging & Transportation
  • Packaging Method: The main machine is wrapped with moisture-proof, scratch-resistant plastic film; vulnerable components (e.g., control cabinet, cutting blades) are additionally protected with foam padding and wooden crates to prevent damage during transit.
  • Transportation: The machine is shipped via container (size matched to machine dimensions); we cooperate with reliable freight forwarders to offer door-to-door or port-to-port delivery, with real-time shipment tracking provided to customers.
4.3 Payment & Delivery Time
  • Payment Term: 30% deposit via T/T in advance to confirm production; 70% balance via T/T after customer inspection (on-site or via video) and confirmation before shipment.
  • Delivery Time: Production and delivery are completed within a reasonable period after receiving the deposit; specific timelines are confirmed based on customization requirements (e.g., profile design, feeding width adjustment).
China Cold Steel Roll Former RainWater Downpipe Gutter Forming Machine supplier

Cold Steel Roll Former RainWater Downpipe Gutter Forming Machine

Inquiry Cart 0