Hard Alloys Precision Ceramics Vacuum Sintering Furnace Rapid Cooling 180 KVA

Brand Name:Ruideer
Certification:CE; ISO9001; ISO14001; OHSAS 18001; GB/T29490
Model Number:Customizable
Minimum Order Quantity:1 set
Delivery Time:5-8 months
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Zhuzhou Hunan China
Address: No.755, Xianyuehuan Rd, Tianyuan District, Zhuzhou, Hunan Province
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Hard Alloys /Precision Ceramics /Vacuum Sintering Furnace/Rapid Cooling/180 KVA

Equipment function:
Automatic leak detection function
Vacuum sintering function
Ar gas partial sintering function(Static , dynamic partial pressure)
Electrified cooling and insulation function
Rapid cooling function(Put a heat exchanger inside)
Fully automatic control function
Safety interlock function
Break point reheating function
Break point reheating function


Design standards:
The vacuum sintering furnace is a single chamber and double door horizontal and periodic heating structure,which is designed for easy handling and maintenance.The whole process is controlled automatically. It can realize full load continuous operation, 300 furnace times/year or 300 working days/year. It uses graphite element resistance heating (low voltage, high current) . In addition, there are multiple heating units, each of which controls the temperature separately.


Device color matching:
The surface of furnace body, transformer, control cabinet and vacuum pump is light gray (color code: RAL7035). The furnace foot, pump frame and support are matched by sky blue (color code: RAL5015).


Technical Parameters


Available working zone size(W*H*L)

400mm×400mm×1200mm
Max.loading weight550kg
Maximum working temperature1600℃
Actual working temperature1550℃
Pumping speed

The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa

(After drying the furnace, under the empty furnace, clean and cold state.)

Leakage rate

≤3Pa/h

(Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test. Average within 3 hours in empty furnace, clean and cold state)


Cooling speed


Empty furnace,the cooling time of cooling temperature from 1300℃ down to 100℃ just cost less or equal 5 hours.(water temperature≤28℃, 2bar≤water pressure≤3bar)
Heating rod materialGraphite
Heating up speedEmpty furnace heating up≤5℃

Heating power


It is about 120KVA (the power configuration of the heating transformer is related to the heating speed, and the heating power can be automatically limited according to the actual use of the production).

Uninterrupted power supply guarantee time


It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 80 minutes.

China Hard Alloys Precision Ceramics Vacuum Sintering Furnace Rapid Cooling 180 KVA supplier

Hard Alloys Precision Ceramics Vacuum Sintering Furnace Rapid Cooling 180 KVA

Inquiry Cart 0