Rapid Cooling Time 5-6h Sintering Furnace Process , Easy Loading Metal Sintering Furnace

Brand Name:Ruideer
Certification:CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
Model Number:450×450×1200/500×500×1800
Minimum Order Quantity:1 set
Delivery Time:100-120 work days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Zhuzhou Hunan China
Address: No.755, Xianyuehuan Rd, Tianyuan District, Zhuzhou, Hunan Province
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Rapid Cooling Time 5-6h Sintering Furnace Process , Easy Loading Metal Sintering Furnace


Features

1. Rapid cooling time: only needs 5 - 6 hours.

2. Special debinding process with excellent sealing structure helps avoid contaminating inside components.

3. Horizontal design for easy loading/unloading and maintenance.

4. Automatic control of the entire process.

5. This kind of integrated vacuum dewaxing and sintering furnace adopts cyclic single-room heating mode. The whole process is automatically controlled, monitored, and recorded by the computer.

6. Heating elements are designed with cylindrical structure, which, compared with traditional square structure, enjoys larger loading space, more flexible dimensions and more uniform atmosphere.


Loading space450*450*1200/500*500*1800
Max.working Temp:1600℃
Cooling Period≤5h/ ≤6h
Vacuum leakage rate3Pa/h(Average in cold,empty,dry chamber within 24 hours)
Vacuum pumpSlide-valve Pump,Roots Pump (Imported Pump or domestic Pump according to customer's requirement)
Wax-collection Rate≥98%
Temp.& Atmosphere Uniformity± 0.4KAM,Magnetic saturation: ≤ ±0.3,Temp.variation:≤ ±8℃
Temp. measurement ModeWre5-26 thermocouple
Temp.Control Mode3-zone or 4-zone Temp. Control
FunctionsVacuum heating,vacuum dewaxing,H2 dewaxing,heating flowing gas,heating with gas mixture(CO2,CH4,H2),Rapid cooling
Heating power180KVA/280KVA

Note: The above specifications are defined according to cemented carbide .The above parameters can be adjusted to the process requirements, they are not as acceptance standard, the detailed spec. will be stated in the technical proposal and agreements.


Advantages

1. Compact structure, small occupied area, low energy consumption and rapid cooling speed, saving energy and protecting environment.

2. Full range of sizes available, ranging from furnaces for experimental R&D, small and medium-sized enterprises to furnaces for mass production. We can also design integrated vacuum dewaxing and sintering furnaces of other sizes according to customer’s specific requirements.

3. Round or square graphite box is available for different applications.

4. Complete dewaxing mode with high wax-collection rate, suitable for different forming agents including rubber, paraffin wax, PEG and extrusion forming agents.

5. High automation level as well as safe and reliable operating system.

6. The control system of the ceramics vacuum dewaxing sintering furnace is highly-automatic and humanized with data record and backup function.

7. The insulation box uses “sandwich” structure and high-strength CFC material that is not prone to deform after years of use.

8. Door of the insulation box is designed with special “step” design for improved insulation effect and extended service life of the insulation box.

9. Remote control, diagnosis and repair can be realized.

10. The electrode arc monitoring system can prevent serious damage to furnace shell caused by overheat and arc effect.

11. The function of resuming heating after short-time power failure can provide protection to the product in the furnace.

12. Persistent efforts of our R&D team in improving these integrated vacuum dewaxing and sintering furnaces have enabled Ruideer to obtain 13 patents up till now.

China Rapid Cooling Time 5-6h Sintering Furnace Process , Easy Loading Metal Sintering Furnace supplier

Rapid Cooling Time 5-6h Sintering Furnace Process , Easy Loading Metal Sintering Furnace

Inquiry Cart 0