

Add to Cart
Automatic Metal storage racks cold Roll Forming Machine for storage
shelves
Working Flow
Decoiling --- leveling --- Servo feeding --- Punching Holes ----
Rollforming ----Cuting--- Finished Racks on Tables
Control System | PLC Colored Touch Screen |
Main Frame | 350H STEEL |
Side Plate Thickness | 18mm |
Main Power | 15kw+4kw |
Power Supply | 380V, 3-Phase,50Hz or any |
Forming Speed | 8-12m/min |
Roll Station | 19 stands |
Shaft Diameter | 80mm |
Feeding Thickness | 1.5-2.5mm |
Cutter Standard | Cr12 |
Roller Standard | 45# Plating Cr |
Customized according to customer requirements |
Machine component
1 | Decoiler | 1 set |
2 | Auto Punching Machine | 1 Set |
3 | Main Rollforming Machine | 1 set |
4 | Straightening System | 1 set |
5 | Hydraulic Station | 1 set |
6 | Auto-Cutting system | 1 set |
7 | PLC Control System | 1 set |
8 | Run Out Table | 1 set |
Customized rack upright post drawing
Advantages of Our Machines
1. High quality anti-rust roller: CNC machine processed, Cr12 mould
steel for a long lifespan
2. Heating treatment: it is processed for the cutting frame to
release the steel stress to avoid deformation and the hardness can
reach to 60 degree.
3. Cutter blade: Cr12 mould steel with quenching treatment for long
lifespan.
4. Stronger driving system: bigger inch train,or gear box driving
system.
5. High precision: shafts for rollers are processeded by grinding
machine. Rollers are CNC processed to ensure the precision
performance.
6. Excellent after services: Technician can be sent to customers'
factory for installation and training; 24 hours feedback and 7 days
spare parts delivery.
Guarantee:
12 Months guarantee. if some part of the machine is broken. we will
supply the best part,but if the damaged parts due to operate
error,buyer will pay for the shipping fee.
After-sale service:
We sent technician to your country to fix the machine.the buyer
shoule bear all the cost includng:visa,roundtrip ticket and
suitable accommodation,also buyer should pay the salary 100USD/DAY.