1 Mw Francis Hydro Turbine Generator Equipped With Automated Control Panel

Brand Name:Foster
Certification:CE/TUV/ISO9001/From-E
Model Number:HL220-WJ-60
Minimum Order Quantity:1 Set/Sets
Place of Origin:Sichuan, China (Mainland)
Supply Ability:10 Set/Sets per Month
Contact Now

Add to Cart

Verified Supplier
Location: Chengdu Sichuan China
Address: Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

50 Years Long Life 1 Mw Francis Turbine Generator Equipped With Automated Control Panel For Hpp


Our main products included:


1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series .


Product features:

The mixed flow water turbine we see in various hydropower stations is also known as the Francis turbine, invented by the famous American engineer Francis in 1849, also known as the Francis turbine, or radial flow turbine. Water flows radially into the runner, and then flows out approximately axially. The runner consists of a crown, a ring and a blade. In recent years, the development trend is high head, large capacity, high specific speed and high efficiency.


1, suitable for high head,small flow and flow changes in large runoff hydropower station;


2. With the power plant investment is small,compact units structure characteristics;


3. Has the efficiency changes smoothly,operating a wide range,even in the 15%-20%load is reduced efficiency;


4. Suitable for high head small flow station in mountain area;


5. A unit construction,simple restrictions without cavitation condition,the advantages of stable ooperation,less investment,construction area.


Product parameters:

HL-WJ-Francis tubine generator unitGeneratorGevernor or Regulating workValve
Turbine
TypeWater head(m)Discharge (m³/s)Speed (r/min)Power(kw)Efficiency(%)
HL260 C-WJ-8413.23.9375455.589.6SFW400-16/1180YT-6000PDF6-WD Dg1200
15.14.2375554.389.1SFW500-16/1430
17.74.54375693.488SFW630-16/1430
20.74.9428.6886.488.8SFW800-14/1430YWT-10000
23.95.28428.6108587.7SFW1000-14/1430
285.715001391.488.8SFW1250-12/1430
HL260 C-W(L) J-100SFW500-20/1730YT-6000PDF6-WD Dg1200
12.15.2830056490SFW500-20/1430
145.72300701.989.4SFW630-20/2150
16.36.18300872.488.4SFW630-20/1730 SFW800 20/2150YWT-10000
18.86.63375110190SFW800-20/1730
21.87.15375136889.56SFW1000-16/2150
25.77.76375172688.1SFW1250-16/2150YWT-18000
30.18.39428.62210.989.2SFW1600-16/2150
SFW2000-14/2150
HL260 C-LJ-12013.17.825087088.5SF800-24/2150YWT-10000PDF6-WD Dg1500
15.18.4108787.7SF1000-24/2150
17.69.06300135988.6SF1250-20/2600
20.49.76172088.2SF1600-20/2600
23.710.51215188.5SF2000-16/2600YWT-18000
27.411.31375267488.2SF2500-16/2600

Product pictures:


Installation design drawings:



Company Information

Advantages

Our workshop

Packaging & Shipping


FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.


China 1 Mw Francis Hydro Turbine Generator Equipped With Automated Control Panel supplier

1 Mw Francis Hydro Turbine Generator Equipped With Automated Control Panel

Inquiry Cart 0