Home /

On Grid / Off Grid Water Turbine Generator Equipped With Detection System

On Grid / Off Grid Water Turbine Generator Equipped With Detection System

Brand Name:Forster
Certification:CE/TUV/ISO9001/From-E
Model Number:CJ237-w-45/1*4.8
Minimum Order Quantity:1 Set/Sets
Delivery Time:120days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Chengdu Sichuan China
Address: Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA
Supplier`s last login times: within 31 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Factory Direct Supply Of High Quality And High Efficiency Equipped With Detection System Mini Hydro Power Plant


Our main products included:


1. Kaplan turbine generators series.


2. Turgo turbine generators series.


3. Tubular turbine generators series.


4. Francis turbine generators series.


5. Pelton turbine generators series.


Product features:


Nowadays, the pelton turbine, which takes the water truck as the prototype, is becoming a new hot field in the field of water turbine. When other kinds of turbine are relatively mature, the impact turbine is receiving more and more attention. Modern pelton turbine is a kind of hydraulic prime mover which uses special water guide mechanism to draw out free jet with kinetic energy and rush to the runner bucket to make the runner rotate and do work so as to complete the conversion of water energy into mechanical energy. In the impact turbine, according to the relative position and working times of the working jet and the runner, it can be divided into the cut-and-impact turbine, the oblique-impact turbine and the double-impact turbine.
Theoretical analysis shows that the efficiency is the highest when the circumferential velocity of the bucket knot is about half of the jet velocity. When the load changes, the inlet speed direction of the runner remains unchanged. In addition, these turbines are all used in high-head power stations. The change of water head is relatively small and the speed changes little, so the efficiency is less affected by the change of load, the efficiency curve is relatively gentle, and the maximum efficiency exceeds 91%.


1.suitable for high head,small flow and flow changes in large runoff hydropower station.


2.With the power plant investment is small,compact units structure characteristics.


3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.


4.Suitable for high head,small flow station in mountainous area.


5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.


Product parameters:

CJ237-W-45/1x4.8 Hydro Tubine Performance Data And Supporting Table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
Design head(m)Under the design headDesign speed (r/min)The power of generatorRated speed(r/min)Runaway speed(r/min)Vavel controlGuide vane controlDiameter (mm)
Flow rate (m3/s)The output(kw)
CJ237-W-45/1x4.8600.06286372610001800Between the unitedmanually200
700.06535.9688407501500Between the unitedmanually200
800.0743.9735407501500Between the unitedmanually200
900.07451.9780557501500Between the unitedmanually200
1000.07859.7822557501500Between the unitedmanually200
1100.08269.18627510001800Between the unitedmanually200
1200.08580.29017510001800Between the unitedmanually200
1300.08990.89377510001800Between the unitedmanually200
1400.09210293710010002200Between the unitedmanually200
1500.095112100710010002200Between the unitedmanually200
1600.098123104010010002200Between the unitedmanually200
1700.0102134107312510002200Between the unitedmanually200
1800.0104144110312510002200Between the unitedmanually200

Product pictures:


Installation picture:


Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

China On Grid / Off Grid Water Turbine Generator Equipped With Detection System supplier

On Grid / Off Grid Water Turbine Generator Equipped With Detection System

Inquiry Cart 0