Power Saving Vacuum Cooling Machine High Efficiency Convenient Operation

Brand Name:Sunicorn
Certification:CE
Model Number:Customized
Minimum Order Quantity:1 set
Place of Origin:Guangdong, China
Supply Ability:60 Set/Sets per Month
Contact Now

Add to Cart

Site Member
Location: Shenzhen Guangdong China
Address: Rm. 1002, Floor 10, Zone A, 9 Pingji Ave., Xialilang Community, Nanwan Subdistrict, Longgang Dist., Shenzhen, Guangdong, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

fast cooling easy to operate power saving vacuum cooler for fruit vegetable pre-cooling vacuum cooling


VACUUM COOLER

SPECIALIZING IN POST HARVEST COOLING SOLUTIONS


Condenser Options: Air cooling/Water cooling / Evaporative cooling Condenser Options: Air cooling/Water cooling / Evaporative cooling Function Options: Hydro system&Water spray system Door Options: Manual Door/Horizontal Sliding Door/ Upwards Lifting Door/ Vertical Lifting Door Material:Q235 carbon steel or 304 food grade stainless steel

PRINCIPLE OF PRESERVATION

The vacuum system evacuates the air contained in the entire vacuum chamber. This evacuation, causing the drop in pressure inside the chamber, is what provides the opportunity for the product inside the chamber to drop in temperature by means of “evaporative cooling”. “Evaporative cooling” is achieved as the moisture in the product “boils off” under the reduced pressure inside the vacuum chamber. The air to be evacuated from the vacuum chamber not only includes the air surrounding the palletized product but also the air that is in empty spaces found inside the boxes or cartons of the product to be cooled.


Q1: How many steps can I get the machine from your factory to my hand?

a. send us enquiry, tell us your demand as specific as you can;

b. phone/online communication → the most suitable models suggested → design drawings → comments & modification → quote;

c. visit factory if required,

d. down payment → production → balance payment → delivery; e. local preparation ready → engineers fly to installation if needed → after sales.


Q2: Production time?

A2: It usually takes 38~45 working days to produce since the day when we confirm your down payment, for series equipments may need more days, will inform you before order.


Q3: Payment method?

A3: 100% TT is preferred, 50% TT before production, the balance 50% before delivery.


China Power Saving Vacuum Cooling Machine High Efficiency Convenient Operation supplier

Power Saving Vacuum Cooling Machine High Efficiency Convenient Operation

Inquiry Cart 0