Home /Oil Field Equipment /

sell oilfield XJ700 Workover Rig and related spare parts

sell oilfield XJ700 Workover Rig and related spare parts

Brand Name:new
Certification:new
Model Number:new
Minimum Order Quantity:1pc
Delivery Time:30 work days
Place of Origin:china
Contact Now

Add to Cart

Active Member
Location: Dongying Shandong China
Address: No430 huanghe Road,dongying city,China,Shandong
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

oilfield XJ700 Workover Rig and related spare parts


for more,pls send saleskd2013@hotmail.com


Detailed Product Description
XJ700 workover rig is truck-mounted type workover equipment, it adopts home-made 6×6 special chassis, high speed diesel engine is equipped on deck, it adopts hydraulic mechanical transmission mode, the starting torque is strong, the transmission efficiency is high; It mainly consists of single drum drawworks, two-section telescopic mast, integrated box type crown, 3×4 traveling structure, hydraulic and pneumatic system etc. It is mainly used for middle and small workover job in oil and water well and the suitable tubing is 73mm(2.7/8″), the well depth is 3200m~3600m.
① The chassis is designed and manufactured by our company, it is 6×6 special truck chassis, it has the feature of comfortable to operate and sit , and it has a good cross-country performance. ② The power system adopts high speed diesel engine matching with hydraulic transmission box, the transmission is steady and flexible, the operation is simple and easy. ③ The 21m two-section mast or 23.5m two-section mast is optional, and simple drilling platform is optional ④ Drawworks system can adopt single drum and double drum type, the main drum is integral LEUBS groove, the rope is arranged orderly, it is equipped with a crown-o-matic device.

Product model


ZYT5301TXJ Workover Rig (XJ750)


ZYT5320TXJ Workover Rig (XJ700)

(2 7/8″)m

Workover depth(2 7/8″upset tubing)

36003200

kN

Nominal hook load

500400

kN

Max.hook load

750675

m

Mast height

21, 23.521,23.5

Dia. Of rope mm/Effective number of rope n

φ26/6φ22/6
Max. hoisting speed of hook m/s1.41.5

mm

Outside dimension when moving (including mast)

12510×2705×425013910×2705×4320

kg

Curb weight

29570,3149031490 Max. hoisting speed of hook Max. hoisting speed of hook m/s
China sell oilfield XJ700 Workover Rig and related spare parts supplier

sell oilfield XJ700 Workover Rig and related spare parts

Inquiry Cart 0