3.3kV 1500kW Medium Voltage Load Bank For Date Center Standby Generator Testing

Brand Name:Fullde
Certification:CE, ISO9001
Model Number:LB-1500KW-3.3KV
Minimum Order Quantity:one set
Delivery Time:25 working days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Baisha 3rd Village Industrial Area, Humen Town, Dongguan City, Guangdong Province, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

3.3kV 1500kW Medium Voltage Load Bank for Date Center Standby Generator Testing


Introduction of the generator load bank: Power generator intelligent testing system can accurately test the output power and loading capacity of various generator units,test all the electric parameters including dynamic parameters of generator units,and mainly consists of two parts:testing control and load cabinet,which is used in coordination with host computer thus materializing intelligentization and automatization to complete the testing of all electric parameters of generator unit,meanwhile,charts,curves and testing report are produced,and no manual operation is required(intelligently controlled,manual/automatic may be selected),to provide scientific testing means for large power generator units.


Specification
Rating voltage/frequency3.3KV/60Hz
Max Load PowerApparent Power: 1500kW
Load Resolutionstep:50KW
Power Factor1
Load Tolerance±5%
Fan Control Power110V/220V,50Hz/60Hz
Wire ConnectionLoad bank input——Copper bar
Control power input——Connector-bar
Max Protection GradeIP56
Way of WorkingContinuous Working
CoolingForced air cooling, horizontal inlet air and upwards exhaust cooling
TransportationHoisting
ColorRAL7032
Dimensions4000*2438*2591
Weight3500KG
AccessoriesSwitch: ABB, Siemens and Schneider, PLC: Panasonic and Siemens;
Operating Environment Parameter
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%

FULLDE Electrical is sustaining carry out the 6S


In order to improve the production efficiency of the company and the production safety factor.FULLDE electric continuously on a regular basis to carry out the 6S management examination.Recently, our company are ushered in the new round 6S major inspection. During this activity, production workshop site, material warehouses and equipment inspection field work area were checked deeply and exhaustively.

During the inspection process, Team members checked each production area and office area very careful , Transverse to the edge, Vertical to the end, In all aspects of inspection, Leave no dead Angle, no blind spots. Meanwhile, determine the solution time, standard, responsible to overhaul the hidden trouble, eliminate unnecessary accidents.


China 3.3kV 1500kW Medium Voltage Load Bank For Date Center Standby Generator Testing supplier

3.3kV 1500kW Medium Voltage Load Bank For Date Center Standby Generator Testing

Inquiry Cart 0