Tiltable Push - Pull Prop for Plumbing Wall Formwork When Erection

Brand Name:HORIZON
Model Number:PUSH-PULL Brace
Minimum Order Quantity:500 pcs
Delivery Time:20-25 days
Payment Terms:L/C, T/T
Place of Origin:CHINA
Contact Now

Add to Cart

Site Member
Location: Xingtai Hebei China
Address: HUSTPARK BUILDING NO. 4, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Tiltable Push-Pull Prop for Plumbing Wall Formwork When Erection

Push-pull props are to align and plumb formwork panels, used with foot plate and connecting parts.

The panel strut enables the initial positioning of the formwork panels for strait and curved walls, for plumbing and bracing concrete wall forms, column forms, and many other construction applications where strong, rigid bracing elements are required.


It also provides stability until permanent structural connections are completed and lateral stability of the building or structure is established.


High push-pull load capacity.

Standard connection with the wing nut and tie rod, no additional parts needed.

Flexible, but same connection to the steel waling on all HORIZON wall formwork panels.


With right-hand and left-hand turning spindle and revolving handle, it’s easy and safe for aligning and propping of wall formwork panels.


Push-pull props are also use for horizontal support of formwork panels.


Wall Formwork Components:

ComponentsSpecification / description
Wall formwork panelFor all vertical formworks
H20 Timber beam

Water proof treated
Height: 200mm
Width: 80mm
Length: as per table size

Steel waling

Painted, powder coated
[12 steel channel

Flange clamp

Galvanized
To connect steel waling and H20 beams

Panel strut

Painted
help formwork panel erection

Waling connector 80

Painted
Used for formwork panels alignment

Corner connector 60x60

Painted
Used for forming inner corner formwork with wedge pins

Top scaffold bracket

Painted,
severs as safety working platform

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

China Tiltable Push - Pull Prop for Plumbing Wall Formwork When Erection supplier

Tiltable Push - Pull Prop for Plumbing Wall Formwork When Erection

Inquiry Cart 0