Drop Forged Scaffold Girder Clamps Zinc Plated Finishing 48.3mm Size EN74 Standard

Brand Name:HORIZON
Model Number:Girder coupler
Minimum Order Quantity:5000 pcs
Delivery Time:15-25 days
Payment Terms:L/C, T/T
Place of Origin:CHINA
Contact Now

Add to Cart

Site Member
Location: Xingtai Hebei China
Address: HUSTPARK BUILDING NO. 4, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Girder Coupler for Clamping Scaffold Tubes to Steel Beams Upto 45mm Thickness


Girder Couplers are used in pairs for right angle securing of scaffolding tube dia 48.3mm to steel beam up to 45mm thick. BS1139 standard.

Surface treatment: self colour(black), galvanized upon request.

Safe and standard package, 20 pcs in bags or cartons, and then on pallet, suits for long distance delivery.


ItemsPipe diameterWeight (Kg)Tech.
Swivel coupler BS113948.3*48.3mm1.05Pressed
Double coupler BS113948.3*48.3mm0.85Pressed
Sleeve coupler BS113948.3*48.3mm1.00Pressed
Single coupler BS113948.3mm0.52Pressed
Board retaining coupler BS113948.3mm0.62Pressed
Putlog coupler BS113948.3mm0.62Pressed
Girder coupler BS113948.3mm1.52drop forged

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
--- bundles: timber beam, steel props, tie rod, etc.
--- pallet: small parts will be put in bags and then on pallets.
--- wooden cases: it is available on customer's request.
--- bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.


What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.


Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.


HORIZON FORMWORK, your reliable formwork partner!

China Drop Forged Scaffold Girder Clamps Zinc Plated Finishing 48.3mm Size EN74 Standard supplier

Drop Forged Scaffold Girder Clamps Zinc Plated Finishing 48.3mm Size EN74 Standard

Inquiry Cart 0