Product Details
Climbing Sequence of Climbing Bracket System for High-rise Wall
Construction
Climbing Formwork CB240 is a crane dependent climbing system and
support structure widely used to pour high walls. It performs as a
loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is
applicable to heights of more than 100 m over ground and allows a
maximum formwork height of up to 5.40 m.
Advantages:
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing
concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in
the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet
site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by
using a safety ladder.
Climbing sequence:
Step 1 The first pouring is to be completed by using the proper wall
elements and has to be exactly aligned with adjusting struts.
| Step 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached
to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the
aligning beam has to be positioned on the brackets and fixed.
|
Step 3 After shifting the climbing scaffold unit to the next pouring
position the finishing platform is to be mounted to the brackets to
complete the climbing system.
| Step 4 Release and remove bolts that fixing the positioning anchor point. Loosen and remove tie-rod Loosen the wedges of the carriage unit.
|
Step 5 Retract the carriage and lock it with wedge. Install upper climbing cones Loosen wind securing device, if any Remove the lower climbing cone
| Step 6 Adjust the carriage into the common center of gravity and lock it
again. Attach the crane sling to the vertical waling Remove the security bolts of the bracket Lift the climbing bracket by crane and attach it to the next
prepared climbing cone. Insert and lock the security bolts again. Install the wind-load device, if required.
|
Step 7 Move the carriage back and lock it by wedge. Clean the formwork. Install reinforcement bars.
| Step 8 Move the formwork forward until lower end rests against top of the
finished section of the wall Adjust formwork vertically by means of push-pull brace. Fix tie-rods for the wall formwork
|
Company Profile
As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing
of formwork systems, scaffolding systems and all kinds of
accessories, which are widely used in commercial, residential and
infrastructural projects. We are not only providing excellent
products, but also offering a comprehensive and complete concrete
formwork and scaffolding solution to clients.
The main products we offer : wall formwork, slab table formwork, scaffolding system, timber beam H20, steel props, formwork wing nuts, tie rods, formwork clamps, and other formwork accessories, scaffolding fittings etc..
Over years of developement, we have completed many projects both in
domestic market and abroad. Thanks to the reliable products quality
and thoughtful service, HORIZON has won good reputation from the
clients.
HORIZON Formwork, your reliable formwork partner!