

Add to Cart
This ERW Pipe making machines is used to level the fixed strip after slitting line, and entry it
to forming machine, bend to pipe by roller, melt the strip edges
through the High frequency current, squeeze and weld the pipe by
the squeeze roll. The high frequency pipe mill is also called ERW
pipe mill.
ERW Pipe making machine Technical Process:
Loading coil—Uncoiler—Leveling—Shearing and butt
welding—Accumulator—Forming—HF welding—Intermediate annealing—Air
cooling—Water cooling—Sizing—Cutting —End facing and
chamfering—Hydraulic testing—UT testing—Marking—Storing.
ERW Tube Mill Other Model
Model | Diameter Range | Pipe Thickness | Line Speed(m/min) |
HG20 | 8-25.4MM | 0.3-1.2MM | 120 |
HG32 | 10-32MM | 1.4-1.5MM | 120 |
HG50 | 16-76MM | 0.7-2.5MM | 30-120 |
HG76 | 25-76MM | 1-4MM | 30-100 |
HG89 | 32-89MM | 1-4.5MM | 30-80 |
HG114 | 45-114MM | 1.5-5.0MM | 30-60 |
HG165 | 60-165MM | 3-7MM | 30-50 |
HG219 | 114-219MM | 4-8MM | 20-40 |
HG273 | 114-273MM | 4-10MM | 15-30 |
HG325 | 165-325MM | 4-10MM | 10-30 |
HG426 | 165-426MM | 4-12.7MM | 8-25 |
HG508 | 219-508MM | 4-16MM | 8-20 |
Our Services
Quality Assurance
we Shall be responsilbe for quality problem resulted from design
and manufacture with one year after successfull installation and
debugging and all the expenses for replacing parts and components(
exclude human factors and vulerable components ) shall be born by
us !
Debugging
1) Factory will send 1-2technical engineers for installation and
testing operation
2) The site, the equipment foundation, cool constructions etc.
responsible by buyer according to equipment material which provides
by supplier, the equipment for installation (lift equipment, tool
etc.), the installation accessory material (wire, drive pipe, water
pipe and so on), the labor force arranged by the buyer.
3) The buyer is responsible for power supply, water supply and gas
supply to the equipment interface connector
4) Buyer Preparation Notes
(a)Machinery device takes the location (length* width)
(b)Power supply: Main power to equipment control bench, unit
position
(c) Air feed: Air compressor (1.5 cubic meters/minutes
(d) Water supply: Water source to machine station