Double Line Stud And Track Roll Forming Machine For Main Channel / Drywall

Brand Name:CHBEST
Certification:CE/BV/SGS
Model Number:XY50x30
Minimum Order Quantity:1 set
Delivery Time:30-40 days
Place of Origin:China Hebei
Contact Now

Add to Cart

Verified Supplier
Location: Cangzhou Hebei China
Address: Rm 1316,Bldg.B Taida International Plaza, Yunhe District Cangzhou City Hebei
Supplier`s last login times: within 36 hours
Product Details Company Profile
Product Details

High Speed Double Line Stud and Track Roll Forming Machine/Main Channel/Drywall

Working flow

Uncoiling—Feeding—Roll forming—Cut to length—Cutting—Output table

Technical Detail


Roller station12Steps
Under Frame40mm-0.01~-0.03(with key-way)
Shaft diameter(Solid)40mm-0.01~-0.03(with key-way)

Shaft material(Hard)

High grade 45# steel,heated and quenched,cylindrical grinding,

Roller material(Hard)

Cr12,heated and

Quenched,polishing

Bearing TypeStandard
Transmission GearHeat treatment
Motor Power5.5KW(Lichao,Shanghai)
Forming Speed0-20m/min(Non-Stop)
Main StructureWelded Structural Steel
Hydraulic CuttingTracking Length To Cut
Pump power5.5 KW
Hydraulic pressure20 Mpa
Voltage Standard380V/3Phases/50Hz
Cutting dieCr12Mov, Quenched processed
Rollers
High quality rollers will help to produce the beautiful and high quality profile. That will satisfy your customers.
Using high qualiy thick shaft, the strength is more durable.
Machine body
The main body of the body without welding, all the use of cast steel, lead to the host body deformation.
PLC Control System
Usually we prodvide the Delta PLC control system, but we can make that according to your need.

Service

In correct operation & maintaining, the machine is guaranteed for 18 months since leaving our

factory excludes the electric elements.

Installation:If installation is needed, we will dispatch a technician to the buyer’s factory abroad to assist

regulating the machine with charge. The buyer should assist the technician to get the Chinese technician's

visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the

buyer shall make the following preparation before arrival of technicians.

* Position the machine in the buyer’s factory.

* Prepare necessary electric wiring.

* Prepare material of trial running.


* Provide labors for assistance and installation during instalation.


China Double Line Stud And Track Roll Forming Machine For Main Channel / Drywall supplier

Double Line Stud And Track Roll Forming Machine For Main Channel / Drywall

Inquiry Cart 0