

Add to Cart
Product Introduction
Filling machine integrates the function of PET bottle washing,
filling and capping together. Based on advanced technology,
innovated and designed to be one of the advanced drinking water
filling production line. It has the advantages of easy operating,
working credible and easy maintenance. It is the ideal equipment
for producing bottled water.
The total machine uses advanced photoelectric detection technology
to detect each parts operation status, no bottle no filling, and no
bottle no capping, automatic and easy operation.
Model | CGF 8-8-3 |
Capacity | 3000BPH (500ml) |
Material | stainless Steel 304 |
Number of rinsing heads | 8 |
Number of filling heads | 8 |
Number of capping heads | 3 |
Bottle diameter | 55-110mm |
Bottle Height | 186-310mm |
Bottle volume | 200-2500 ml |
Deatails
Washing heads
<1>All 304/316stainless steel rinse heads, water spray style
inject design, more save water consumption and more clean
<2>304/316 Stainless steel Gripper with plastic pad, ensure
minimal bottle crash during washing
<3> 304/316 stainless steel washing pump
Filling heads
<1> 304/316 Stainless steel high precision filling nozzle
<2> Filling volume adjustable in fine rank, same liquid level
after filling
<3> All 304/316 stainless steel contact parts & liquid
tank, fine polish, no death corner, easy to clean
<4> 304/316 stainless steel filling pump
Capping heads
<1> Place and capping system, electromagnetic capping heads,
with burden discharge function, make sure minimum bottle crash
during capping
<2> All 304/316 stainless steel construction
1Q:Are you a trading company or a manufactory?
A:We are a factory specialized in this industry for more than 12
years ,can give you best service and support .
2.Q:Where is your factory located? How can I visit there?
A:Our factory is located in zhangjiagang city, jiangsu
province,china. about 2 hours away from Shanghai Pudong Airport .we
will pick you up in the nearest station. All our clients, from home
or abroad, are warmly welcome to visit us !
3. Q: How long is the warranty of your equipment?
A:Two years warranty after customer receive the equipment . We
provide life-long spare parts and technical supports.
4. Q: Installation and Training
A: we provide professional and experienced engineer to customer
factory for installation and training, the installation time is
around 7-30 working days depends on the project.
5. Give me the basic information about you want:
1.what kind products will you produce: water, juice, with gas or
others.
2. What is your capacity: how many bottles per hour
3.what kind of the bottle: pet bottle or glass bottle; bottle
volume; bottle sharp. Better give me the bottle picture
4.the single machine or the whole line.