Women Men Flip Flop Slipper Making Machine With Full Production Line Process - shoes-makingmachine

Women Men Flip Flop Slipper Making Machine With Full Production Line Process

Brand Name:Kingstone
Certification:CE, SGS
Model Number:JL-108
Minimum Order Quantity:1SET
Delivery Time:25-45 DAYS
Payment Terms:D/A, D/P, L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Huarui Industrial Park, Hengjiang Village, Chashan Town, Dongguan City, Guangdong Province
Supplier`s last login times: within 16 hours
Product Details Company Profile
Product Details

Women Men Flip Flop Manufacturing Machine with Full Production Line Process JL-108


PVC slippers production line.jpg.pdf


One Color Flip Flop Manufacturing Machine, Full Production Line for produce flip flop, slipper, sandals, etc.



Features:


1. By computer, Electrical box, PLC control---more simple, fast and precision.
2. It could be equipped with air blowing system. --- can produce light weight, particularly the need for reinforced cooling effect.
3. Computerization in analysis and design---the machine is well in stability.
4. Conformed to human engineering in design---it features operational compatibility.
5. It could be equipped with servo system. --- can save 30~40% electricity.
6. It could be equipped with cooling system. --- can cooling the mould and extend the mould life.
7. The well-interconnected oil circuit by electric control --- can reduce waiting time, quicken production rate, and promote productivity.


Specifications
Machine modelJL-108
Mould-clamping Unit
Work station12,16,20,24,30
Clamping forceTON80
Opening strokeMM210
Mould dimensionMM600*280
Height of injection nozzleMM280
Injection Unit
InjectorSET1
Screw diameterMM60/65/70
Screw L/D ratioL/D20
Max.injection volumecm3650-1000
Injection speedCm/s10
Screw rotation speedR.P.M0-200
Electricity ConsumptionNormalServo
Heating power of injectorKW77
Hydraulic unit motorKW18.515.7+7.5
Total powerKW25.530.2
Temperature controlSection44
Power consumption per hourKw/h15-207-10
Dimension and Weight24 Stations
Machine dimension(L*W*H)MM4600*3600*2300
Machine weightKGS6000
*Note:Above data only for reference.

Payment Terms


1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.

2. T/T, Westem Union, PayPal, Escow, MoneyGram.


Machine Production Time


25-45 days after confirm deposit.


Packing


Professional export package, plastic film packing, or Wooden case packing.


Shipping


By Sea, One Container for one machine


Production Process


Below is the process for produce full shoes, easy operate.

It need 1-3 people for the full process.



Samples:



Welcome to Kingstone Machinery!

China Women Men Flip Flop Slipper Making Machine With Full Production Line Process supplier

Women Men Flip Flop Slipper Making Machine With Full Production Line Process

Inquiry Cart 0