

Add to Cart
Black Surface of Hot Rolled Carbon Steel Flat Bar C50 S50C SAE1050 1.1210
Used for making injection plastic mould, mould frame and some
mid-range machines.
Specifications
1. Grade: SAE1050/S50C/1.1210/50#
2. Standard: ASTM, AISI, JIS, DIN, GB
3. Hot Rolled Condition: Annealing, Black Surface
Chemical Composition(%)
Grade | C | Si | Mn | P | S |
SAE 1050 | 0.48-0.55 | 0.15-0.35 | 0.60-0.90 | ≤0.030 | ≤0.050 |
Hot Sale Products for Carbon Steel flat bar & round bar
STANDARD | Flat Bar Size(mm) | Round bar Size(mm) | Technics | ||||||
DIN | AISM | JIS | GB(China) | Thickness | Width | Length | Diameter | Length | |
1.2010 | SAE1050 | S50C | 50# | 10-450 | 155-2200 | 3000-6000 | 10-350 | 3000-6000 | Hot Rolled or Hot Forged |
1.1191 | SAE1045 | S45C | 45# | 10-450 | 155-2200 | 3000-6000 | 10-350 | 3000-6000 |
Delivery days:
For abundant stock, 7-15 days.
For customized products, 30-50 days.
Package: We provide standard export packing or according to customers'
request.
Quality Contation
Both end of each bar must be cut as require
Ladle furnanced and vacuum de-gassed
Show heat No. on each bar
Surface condition the surface of the hot rolled square bar shall
befree cracks, scar and wrinkles that affect the use of the
billets. In case there is the above-mentioned defect, it shall be
remove.
The mill test certificate shall show the chemical composition, and
it is guaranteed that the chemical composition shall be within the
limit stipulated in the contract.
Production capacity: 1000t/month
Product Photo
Strict Quality Control
Loading Photo
About GUANGZHOU CHANGFENG STEEL CO.,LTD
Q: Are you a manufacturer or merely a trader?
A: We are group of companies and owned manufacturer bases and
trading company. We specialized in plastic mould steel,hot work
mould steel,cold work mould steel,alloy steel for mechanical,high
speed steel, etc. All material are with high quality and
competitive price.
Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party,
such as SGS, CE,ISO if you need. Secondly, we have a complete set
of inspection system and every process is checked by QC. Quality is
the lifeline of enterprise survival.
Q: Delivery time?
A: We have ready stock for most of material grades in our
warehouse. If the material don't have stock, the delivery lead time
is about 30-50days (depend on the quantity)after receiving your
prepayment or firm order.
Q: What is the payment term?
A: T/T or L/C or Trade Assurance.
Q: Can we visit your company and factory?
A: Yes, warmly welcome! We can book the hotel for you before you
come to China and arrange our driver to our airport to pick you up
when you come.