

Add to Cart
Annealed Carbon Steel S50C / 1.1210 / SAE1050 / 50# Forged Steel
Block
SAE1050/1.1210/S50C/50# Carbon Steel, A High strength medium
tensile,low hardenability and low-ductility carbon steel. Have no
temper brittlenss and with normal cutting performance. Usually used
after annealing+queching or normalizing. Used for making injection
plastic mould, mould frame and some mid-range machines.
Specifications
Forged carbon steel S50C
GB(China) | DIN(German) | AISI(USA) | JIS(Japan) |
50# | 1.1210 | SAE1050 | S50C |
Standard: AISI, ASTM, BS, DIN, GB, JIS
Place of Origin: China
Technique: Hot Rolled or Forged
Chemical Composition(%)
C | Si | Mn | P | S | Cr | Ni | Cu |
0.41-0.50 | 0.15-0.35 | 0.6-0.9 | ≤0.035 | ≤0.035 | ≤0.25 | ≤0.25 | ≤0.25 |
Features
1. High-quality medium carbon steel,uniform characteristics of the microstructure.
2. Carbon content (mass fraction,%) ≥ 0.4, good wear
resistance,ductility reduction.
3. Tempering must be quenched to avoid the occurrence of temper
brittleness.
4. Tempering HRC19-22
Applications
1. Can be used for a variety of cold mold die pad.
2. For the manufacture of high wear resistance, dynamic load and
impact of the role of small machined parts and spring pieces.
3. Standard template material.
Available size (mm)
Forged Block (mm) | Forged Round Bar (mm) | |||
Thickness | Width | Length | Diameter | Length |
350-1000 | 800-1600 | 2000-6000 | 200-800 | 2000-6000 |
About GUANGZHOU CHANGFENG STEEL CO.,LTD
Q: Are you a manufacturer or merely a trader?
A: We are group of companies and owned manufacturer bases and
trading company. We specialized in plastic mould steel,hot work
mould steel,cold work mould steel,alloy steel for mechanical,high
speed steel, etc. All material are with high quality and
competitive price.
Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party,
such as SGS, CE,ISO if you need. Secondly, we have a complete set
of inspection system and every process is checked by QC. Quality is
the lifeline of enterprise survival.
Q: Delivery time?
A: We have ready stock for most of material grades in our
warehouse. If the material don't have stock, the delivery lead time
is about 30-50days (depend on the quantity) after receiving your
prepayment or firm order.
Q: What is the payment term?
A: T/T or L/C or Trade Assurance.
Q: Can we visit your company and factory?
A: Yes, warmly welcome! We can book the hotel for you before you
come to China and arrange our driver to our airport to pick you up
when you come.