

Add to Cart
Bottle filling equipment,water bottling machine for sale,liquid
bottle filler for wine glass bottle /carbonated beverage
1. Into bottle way is air conveyor direct connection with Bottle
dial .
2. All 304/316 stainless steel rinse heads, water spray style
inject design, more save water consumption and more clean .
3. 304/316 Stainless steel Gripper with plastic pad, ensure minimal
bottle crash during washing
4. 304/316 stainless steel washing pump make the machine more
durable
1. 304/316 Stainless steel high precision filling nozzle
2. Filling volume adjustable in fine rank, same liquid level after
filling
3. All 304/316 stainless steel contact parts & liquid tank, fine
polish, no death corner, easy to clean
4.304/316 stainless steel filling pump
5.Efficient spray nozzle rinse thoroughly and save water for
flushing
1. Place and capping system, electromagnetic capping heads, with
burden discharge function, make sure minimum bottle crash during
capping
2. All 304/316 stainless steel construction
3.No bottle no capping
4. Automatic stop when lack of bottle
5.Capping effect is stable and reliable ,Defective rate ≤0.2% .
Technical parameter:
Model | CGF8-8-3 |
Washing head | 8 |
Filling head | 8 |
Capping head | 3 |
Production capacity | 1000-3000BPH |
Air source pressure | 0.5-0.6MPa |
Rinsing water pressure | 0.15-0.2 MPa |
Bottle height | 150-340MM |
Bottle diameter | Φ50-Φ110MM |
Filling way | Gravity Filling |
Power | 3ph, 380V/50Hz,2KW |
Overall size | 2100*1800*2400(L*W*H) mm |
Weight | 2300Kg |
If you need our filling machine , please contact to us ,
My whatsapp/tel :008618019396250 let's talk more details
Our machine advantage:
Guarantee:
We response for one year warranty for the machine, however, it
without any human conduct. And provide one-year free spare part for
client. And send engineer to client’s company with client’s
provision for flight charge and accommodation. Help install the
machine, teaching their staff operate the machine and also, we do
have a private school which help our client sending their staff to
china, help them training.
After sales service:
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the
customer is responsible for unpacking and arranging the equipment
according to the placement drawing; and does under our
install-adjust technicians’ guidance. Costs of the staff are
decided at last.
2.Training
We are responsible for offering the technical training to user. The
training content includes the structure and maintenance of the
equipment, control and operation of the equipment. Through
training, users' technical staff can grasp and the skill of
operation and maintenance proficiently, and deal with the general
troubles in time. We will appoint qualified technical staff for the
guidance.
The buyer can send staff to our company for learning.
3.Quality assurance
We guarantee the goods offered are brand-new, not used, with latest
design and suitable material made, and we guarantee the
specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance
indicators within 5 days after feeding operation through the
correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line
caused by our design, technology, manufacture, installation,
adjustment and material defect etc. that all belong to our
responsibility.
The warranty period is 12 months after acceptance check of the
production line. If there is any different between the furnished
equipment in the customer’s factory and the equipment concerned in
the contract, the users have the right to pass the inspection book
to the legal department to claim for compensation to our company
within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by
our design, manufacture and the material quality, and offer the
relevant parts and effective service for free for above reason. We
will offer a widely and favorable technical support, after service
all the time after guarantee period.