

Add to Cart
15 years water bottle packing machine and bottle filling machine for pet glass bottle
Application:
It is suitable for filling water, non-carbonated drink, juice,
wine, tea drink and other liquid, working steable with famous
electrical components and working very stable.
This CGF Wash-filling-capping 3-in-1unit:Beverage Machinery is used
to produce polyester/glass bottled mineral water, purified water,
alcohol, tea drink and other non-gas beverage. It can finish all
the process such as bottle rinsing, filling and sealing fast and
stable. It can reduce the materials and Outsiders touch time,
improve the sanitary conditions, production capacity and economic
efficiency.
1. Using the wind sent access and move wheel in the bottle directly
connected technology; canceled screw and conveyor chains, this
enable the change the bottle-shaped become easier.
2. Bottles transmission adopt clip bottleneck technology, anna com
bottle-shaped transform not need to adjust the equipment level,
only change related the curved plate, wheel and nylon parts is
enough.
3. The specially designed stainless steel bottle washing machine
clip is solid and durable, no touch with the screw location of
bottle mouth to avoid secondary pollution.
4. High-speed large gravity flow valve filling valve, filling fast,
filling accurate and no liquid lose.
5. Spiraling decline when output bottle, transform bottle shape no
need to adjust the height of conveyor chains.
6. Super-low star wheel structure can highly improve the strength
of the whole machine.
7. Central greasing oil system can grease all bearings easily.
8. Gearbox type capping unit gives a close structure, keep oil
inside also using Egers material for longlife. You can also adjust
the capping rounds according to different caps by adjusting gears
below.
9. Host adopt advanced PLC automatic control technology, the key
electrical components from famous company such as Japan's
Mitsubishi, France Schneider, OMRON,ABB.
Technical parameter:
Model | CGF24-24-8 |
Washing head | 24 |
24 | |
Capping head | 8 |
Production capacity | 10000bph |
Air source pressure | 0.5-0.6MPa |
Rinsing water pressure | 0.15-0.2 MPa |
Bottle height | 150-340MM |
Bottle diameter | Φ50-Φ110MM |
Filling way | Gravity Filling |
Power | 3ph, 380V/50Hz,2KW |
Overall size | 2100*1800*2400(L*W*H) mm |
Weight | 1800Kg |
Our machine pictures :
Our machine advantage:
Guarantee:
We response for one year warranty for the machine, however, it
without any human conduct. And provide one-year free spare part for
client. And send engineer to client’s company with client’s
provision for flight charge and accommodation. Help install the
machine, teaching their staff operate the machine and also, we do
have a private school which help our client sending their staff to
china, help them training.
After sales service:
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the
customer is responsible for unpacking and arranging the equipment
according to the placement drawing; and does under our
install-adjust technicians’ guidance. Costs of the staff are
decided at last.
2.Training
We are responsible for offering the technical training to user. The
training content includes the structure and maintenance of the
equipment, control and operation of the equipment. Through
training, users' technical staff can grasp and the skill of
operation and maintenance proficiently, and deal with the general
troubles in time. We will appoint qualified technical staff for the
guidance.
The buyer can send staff to our company for learning.
3.Quality assurance
We guarantee the goods offered are brand-new, not used, with latest
design and suitable material made, and we guarantee the
specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance
indicators within 5 days after feeding operation through the
correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line
caused by our design, technology, manufacture, installation,
adjustment and material defect etc. that all belong to our
responsibility.
The warranty period is 12 months after acceptance check of the
production line. If there is any different between the furnished
equipment in the customer’s factory and the equipment concerned in
the contract, the users have the right to pass the inspection book
to the legal department to claim for compensation to our company
within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by
our design, manufacture and the material quality, and offer the
relevant parts and effective service for free for above reason. We
will offer a widely and favorable technical support, after service
all the time after guarantee period.