

Add to Cart
water filling machine for PET plastic bottles SUS304,316 and water bottling machine for glass bottle
Water filling machine future:
1,The air conveyor is directly connected with bottle-in star wheel.
The bottle is transferred by neck holding.
2,High speed filling line is of clamp transferring technology.
Bottle shapes are more varied, and the working table inside the
machine is more laconic.
3,By 3-in-1 monoblock, the bottle goes through rinsing, filling and
capping with little abrasion, and the transferring is stable,
bottle changing is easier.
4,Specially designed stainless steel bottle clamp dose not contact
the thread parts of the bottle neck, avoiding the second
contamination.
5,The high speed line is of ring type pressure bearing hydraulic
cylinder.
6,High speed and large flow filling valve assures the high filling
speed and exact fluid level.
7,Spares contact with the liquid are all of excellent stainless
steel or food level plastic. The electric system is of
international brand and achieves the national food sanitary
standard.
8,The bottle-out star wheel is of screw down shape. When bottle
size is changed, there is no need to adjust the transferring
chain's height.
Specification:
3-in-1 monoblock is composed of rinser, filler, capper, frame,
sealing window, main motor and transferring system, cap unscrambler
and electric control system etc.
The overturning device of the rinser is mainly composed of water distributor, bottle clamp, up turnplate, guide rail, protection cover, spraying device, defrosting tray.
Filling device is mainly composed of filling tank, filling valve, guide rail, elevating device, elevating device, etc.
Capping device is composed of cap unscrambler, cap drop rail and capper.
The assistant equipments include rinsing water recycle tank, bottle-in conveyor and bottle-out chain conveyor.Besides that, according to the customer's requirement, the machine could be equipped with manual bottle loader (or bottle unscrambling), manual bottle arranging multichain, automatic cap feeder and so on.
Technical parameter:
Model | CGF24-24-8 |
Washing head | 24 |
Filling head | 24 |
Capping head | 8 |
Production capacity | 18000bph |
Air source pressure | 0.5-0.6MPa |
Rinsing water pressure | 0.15-0.2 MPa |
Bottle height | 150-340MM |
Bottle diameter | Φ50-Φ110MM |
Filling way | Gravity Filling |
Power | 3ph, 380V/50Hz,2KW |
Overall size | 2100*1800*2400(L*W*H) mm |
Weight | 12300Kg |
Our machine advantage:
Guarantee:
We response for one year warranty for the machine, however, it
without any human conduct. And provide one-year free spare part for
client. And send engineer to client’s company with client’s
provision for flight charge and accommodation. Help install the
machine, teaching their staff operate the machine and also, we do
have a private school which help our client sending their staff to
china, help them training.
After sales service:
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the
customer is responsible for unpacking and arranging the equipment
according to the placement drawing; and does under our
install-adjust technicians’ guidance. Costs of the staff are
decided at last.
2.Training
We are responsible for offering the technical training to user. The
training content includes the structure and maintenance of the
equipment, control and operation of the equipment. Through
training, users' technical staff can grasp and the skill of
operation and maintenance proficiently, and deal with the general
troubles in time. We will appoint qualified technical staff for the
guidance.
The buyer can send staff to our company for learning.
3.Quality assurance
We guarantee the goods offered are brand-new, not used, with latest
design and suitable material made, and we guarantee the
specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance
indicators within 5 days after feeding operation through the
correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line
caused by our design, technology, manufacture, installation,
adjustment and material defect etc. that all belong to our
responsibility.
The warranty period is 12 months after acceptance check of the
production line. If there is any different between the furnished
equipment in the customer’s factory and the equipment concerned in
the contract, the users have the right to pass the inspection book
to the legal department to claim for compensation to our company
within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by
our design, manufacture and the material quality, and offer the
relevant parts and effective service for free for above reason. We
will offer a widely and favorable technical support, after service
all the time after guarantee period.