12000 BHP Beer Can Filling Machine , Can Filling Line With Cup Filling Machine

Brand Name:Higee
Certification:CE ISO
Model Number:GF24-6
Minimum Order Quantity:1 set
Delivery Time:30 working days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Site Member
Location: Shanghai Shanghai China
Address: 1708#, No. 1 building, Lane 2742, Pudong Avenue Road, Pudong, Shanghai
Supplier`s last login times: within 33 hours
Product Details Company Profile
Product Details

12000 BHP Can Beer Filling and Sealing Machine and automatic bottle filling


machine with cup filling machine



Features


This beverage can filling machine can be used for different material of cans, such as plastic, iron, aluminum and so on ,and the different size of cans is allowed.We can design the euipment according to your requirements. Our machine is fully automatic and have scientific and reasonable design. Also with beautiful appearance and complete functions, it’s easy to operate and maintain. We all use advanced German technology and Italian technnology.
Filling and sealing is the overall designed, power system by filling sealing system to Ensure that both the absolute synchronization and coordination.
The beverage can filling machine has the characteristics of filling reposefully, high speed, liquid level control, capping reliably, frequency conversion timing, less material loss.
We all use 304 stainless steel or food level material to ensure the high quality of our machine. PLC control system is used and electric parts are using famous brand like Mitsubishi Siemens Schneider and so on.


Main technical parameters


ModelGF24-6
Working stationsfilling 24 capping 6
Max Capacity200cans/min (containing gas)

Suitable bottle

type


Φ50-Φ115 H=190-320


Rinsing water

pressure


≥0.06MPa≤0.25Mpa

Power

6KW


Dimension2600*1700*2200 mm
Total weight3700kg

Filling and capping part photos :



FAQ


Q: How Can I get a detailed quotation from you?
Just send us inquiry through this web page is ok. I will reply your any question within in 5 hours.
Q: Can your company able to offer 2 years gurantee?
Yes it's no problem for our company. During the warranty, if you need any spare parts, we will delivery it to you in DHL for free.
Q: Do you offer a free set of replacement parts for parts that commonly wear out quickly?
All spare parts are always avaliable for delivery. Above 90% spare parts are made by ourselves. Because we have our own processing center, so we can supply at anytime.
Q: What is the foot print of the entire canning line? I do not know how many meters of conveyors are involved so can not determine the over-all size of the line with all of its components.
We will design and make a layout plan according to customer's factory floor plan.
Q: What is the cost to send installation/training staff? How many staff do you need to send?
Whole installation/traning process needs 2peoples. Around 10days. Client needs to provide us round-air ticket, visa fee, local transpotation, accomodation, food, and 100USD/day/person.
Q: Beside Canning Machine, can you supply other accessories like depalletizer or labeling machine for complete line?
Yes we are a professional factory that can provide turnkey solution. Just free to send us inquiry is ok.
China 12000 BHP Beer Can Filling Machine , Can Filling Line With Cup Filling Machine supplier

12000 BHP Beer Can Filling Machine , Can Filling Line With Cup Filling Machine

Inquiry Cart 0