PLC Control Single Screw PSF Production Line

Brand Name:virock
Minimum Order Quantity:1 unit
Delivery Time:40 days
Payment Terms:L/C, T/T, D/P
Place of Origin:China
Price:USD
Contact Now

Add to Cart

Site Member
Location: Changsha Hunan China
Address: Virock Road 8, Wangcheng economy & technology development zone, Changsha, Hunan, China
Supplier`s last login times: within 43 hours
Product Details Company Profile
Product Details

High Speed Polyester Staple Fiber Production Line


Description:

This stenter is the latest version, enhanced and refined with the European Technology and the technical advice and feedback from the end users. This machine is designed to match the requirement of all kind of fabric., from fabric feeding to overfeed, from stentering to cooling and to fabric unloading.It is done just by adjusting the mechanical and electrical device on the machine, Various adjustment options are available to fufill different requirement.


Process flow of polyester staple fiber

Fore spinning Line:
Vacuum Dryer -> Hopper -> Screw Extruder -> Filter -> Spin Beam (Meter Pump System, Spin Pack, Spinneret) -> Quenching Unit -> Interfloor Duct -> Draw-off Wall -> Capstan Roller -> Sunflower Gearing unit -> fiber can traverse system


Post spinning Line:

1.1 2-Dimensional Hollow Fiber:
Can Creel -> Inlet Thread Guide -> Tow Guide Stand -> Dipping Bath -> 1st Draw Stand -> Draw Bath -> 2nd Draw Stand -> Draw Steam Chest -> 3rd Draw Stand -> Tow Stacker -> Crimper Steam Box -> Crimper -> Tow Conveyer -> Relaxer -> Tow Tension Stand -> Cutter -> Chain Plate Conveyor -> Baling Press

1.2 3-Dimensional Hollow Fiber:
Can Creel -> Inlet Thread Guide -> Tow Guide Stand -> Dipping Bath -> 1st Draw Stand -> Draw Bath -> 2nd Draw Stand -> Draw Steam Chest -> 3rd Draw Stand -> Tension Control Device -> Tow Stacker -> Crimper Steam Box -> Crimper -> Silicon Oil Sprayer -> Tow Tension Stand -> Cutter -> Fiber Spreader -> Fiber Leveler -> Relaxer -> Chain Plate Conveying system -> Baling Pressrecycled psf production line


Main Features

1. Equippments are in simple structure and linear type, easy to be installed and maintained.

2. Adopt advanced world famous brand components of pneumatic parts ,electric parts and operation parts.

3. High pressure double crank to control the die opening and closing.

4. Running in a high automatization and intellectualization,no pollution

5. Apply a linker to connect with the air conveyor ,which can directly inline with filling machine .

Our Service

1. Delivery time: Short.

2. Online service: 24 hours

3.Warranty: 1 year for the key components.
4. Offer the parts at reasonable price for life time.
5. Offer buyer the technical service and workshop layout.
6. Design the layout for buyer.


Packing & Delivery
Packing:
Standard export packing
Port
Anyport of China
Lead Time :
30 -40 working days after receiving the down payment

China PLC Control Single Screw PSF Production Line supplier

PLC Control Single Screw PSF Production Line

Inquiry Cart 0