

Add to Cart
Latest Design Cocoshell Fired Coal Hot Water Boiler Biomass Boiler
1. High Security:
Feed water system adopt computer controlling, automatic feed water.
Equip with water lack protection and over pressure protection
devices, security and reliable.
2. Long Life and Durable:
Excellent professional design, advanced production processes,
strict quality inspection control, is the quality assurance of each
boiler, the service life of normal use boiler all above 20 years.
3. Environmental Protection and Low Noise:
The boiler smoke is low emission, and equip with high efficiency
dust remove device at boiler end, low noise fans, to make the smoke
emission reach to nation environmental protection requirements.
4. Normative Production:
Each part of boiler are all produce according with national and
international standard (ISO), each procedure of production are all
strictly follow advanced production technology, to ensure the
quality of our products.
5. High Quality Services:
Technology consulting, technology services, installation guidance,
regular and irregular re-tracking services for users, offer high
quality and perfect services at any time, ensure our customer
secure purchase, and happy utilization.
Accessories Functions
Electrical cabinet | Be responsible for electrical control of auxiliary machines, ensure the whole system work automatically and make operation convenient. |
Feed water pump & water circulating pump | Put water into boiler and promote hot water circulation.Compact structure,low power consumption,low failure rate |
Automatic water softener | Remove Mg+,Ca+ in the water and improve water quality. Prevent hurt to boiler tube,entend the boiler using life time. |
Economizer | Heat inlet water and reduce exhausted gas temperature, which increase boiler efficiency and is good for environment |
Steam header | Distribute steam to different directions.Used for distributing the steam to each pipe of user's workshop |
Forced draught fan | Blow clean air into the boiler and promote exhauted gas out, ensure the air circulation of the whole system. |
Dust collector | Remove the dust and ash in exhausted gas to protect envrionment and reduce polutions. |
Gas flue and Chimney | Provide channels for exhausted gas flow. |
Fuel feeding | Automatic feeding device |
Grate speed adjustor | Regulate the suitable speed of chian grate according to the combustion situation. |
Slag remover | Extract slags mechanically and save labour cost. |
Induced draught fan | Blow clean air into the boiler and promote exhauted gas out, ensure the air circulation of the whole system. |
Safety Valves | It will work automatically when the working pressure is over high to protect the whole system |
Pressure Gauge | Show the working pressure of the boiler |
Check Valves | Connect pipes to ensure water not to flow backwards |
Blow-down Valves | To let out the sediment, impurities or other things in the bottom |
Shut-off Valves | Turn on or off the pipes |
FAQ
1. How to avoid collapse of bricks, and what should be done if it
happened?
When boiler installation finished, drying the boiler according to
the manual, it's very important to avoid collapse of bricks.
2. How many stokers do I need for one boiler?
Usually 3 person, every 8 hours a shift.
3. Rules for ash removal.
Clean the ash and leaked coal in ash hopper in definite time. Every
shift should open the soot door at the bottom of boiler left for
twice, to clean the ash deposition in the wind chamber, make sure
there is no blocking.
4. How long it takes for boiler installation and debugging?
The boiler is easy to install, it could be finished within 2 weeks,
we have the professional abroad installation team to help for
installation. Moreover, our technicians offer after-sale service
every quarter in many countries, like Philipines, Bangladesh,
Indonesia, Pakistan.