Fire Tube Hot Water Boiler Low Running Cost 3500 Kw ASME Certification

Brand Name:Yuanda
Certification:ISO9001,SGS,CE,ASME
Model Number:WNS
Minimum Order Quantity:1 set
Delivery Time:about 15-25 working days after payment
Payment Terms:L/C, D/A, T/T, D/P, Western Union
Contact Now

Add to Cart

Active Member
Location: Zhengzhou Henan China
Address: Qihang Building D-709,Hanghai Road,Zhengzhou City,Henan Province,China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Fire Tube Oil Fired Hot Water Boiler Low Running Cost 3500 Kw Boiler


Before Reading


Dear friend, welcome to Yuanda Boiler page. We are China leading industrial boiler manufacturer with 61 years experience in boiler field.


1.If you know well about boiler, then congratulations, you can contact us about boiler details and price through the bottom contact information.


2. If you are new in this field, donot worry, the following will help you to choose the right product.

(1) What capacity boiler do you need?
(2) What fuel do you plan to use?
(3) What is the appplication of the boiler?
The above questions are what boiler manufacturers will ask you to confirm the boiler model. If you know the answers of these questions, you will get the prices list very fast. If you are not clear, also do not be upset, please contact us through the bottom contact information or send us inquiry directly.

3. Refer to fuel, we mainly devide steam boilers into two types, here I am going to introduce them one by one.
(1) coal/biomass/wood/solid fired hot water boiler
(2) gas/oil fired hot water boiler


Boiler introduction


WNS series gas/oil fired boiler is horizontal three pass fire tube wet back full automatic boiler. It normally suitable for 500kg to 20ton/h capacity, use all kinds of gas and oil fuels,such as diesel oil,heavy oil.


1. WNS series oil Gas fired hot water boiler realize high efficient heat transfer, sufficient burning with brand burner, environment protection
2. Adopted international latest technology for big volume combustion room design, and use brand burner machine
3. Corrugated furnace design make large heat transfer area and protect furnace
4. Using spirally corrugated tube , 1-2 faster heat transfer efficiency and remove hidden danger of welding cracks
5. Adopted wet-back structure that can reduce faults rate and maintenance cost
6. Equipped with protection devices for overheating, overpressure, lacking water, leak detection, flameout etc.


Boiler picture



Boiler parameter


Boiler modelRated thermal powerRated pressureRate outlet temp.Return water temp.Thermal efficiencyWeightDimensions
MWMPa%tonmm
WNS0.7-0.7/95/70-Y(Q)0.70.79570914.33561×1690×1910
WNS1.4-0.7/95/70-Y(Q)1.40.795709274111×1950×2199
WNS2.8-0.7/95/70-Y(Q)2.80.79570939.54732×2150×2448
WNS4.2-0.7/95/70-Y(Q)4.20.7957093.2165500×2600×2990
WNS5.6-1.0/95/70-Y(Q)5.61957093.524.66450×2800×3200
WNS7-1.0/95/70-Y(Q)71957093.526.26800×2900×3394
WNS10.5-1.0/95/70-Y(Q)10.51957093.5377150×3200×3540
WNS14-1.0/95/70-Y(Q)141957093.5558200×3400×3826

Boiler transportation


1. Nude packaging for boiler main part and wood box packaging for boiler accessories.
2. Generally use 20 container, 40container or 20 flat rack container and 40 flat rack container to load the boiler.
3. All goods will be fixed after packing into containers.
4. We have stable shipping company to cooperate for long term. They will confirm the safety of the goods.
5. Shipping way is different according to customer's country. Mostly by sea. Some country by train.


China Fire Tube Hot Water Boiler Low Running Cost 3500 Kw ASME Certification supplier

Fire Tube Hot Water Boiler Low Running Cost 3500 Kw ASME Certification

Inquiry Cart 0