Socket Welding Equal Tee 316/304 Stainless Steel Forged Fittings Tee Pipe Fittings

Brand Name:TOBO/METAL
Certification:ISO/PED/TUV/SGS/LR/BV
Model Number:TEE
Minimum Order Quantity:1 pcs
Delivery Time:20 working days
Payment Terms:T/T, D/A, D/P, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

Socket Welding Equal Tee 316/304 Stainless Steel Forged Fittings Tee Pipe Fittings

Product Description

Advantage:

1. Corrosion Resistance 2. Heat Resistance 3. Heat Treatment 4. Welding 5. Machining

Product nameButt welding pipe fitting 45 degree long/short radius elbow
SizeSamless size from DN15-DN700; Welding size:DN200-DN2000
MaterialASTMCarbon steel: (ASTM A234WPB,,A234WPC,A420WPL6.
Stainless steel: (ASTM A403 WP304,304L,316,316L,321. 1Cr18Ni9Ti, 00Cr19Ni10 00Cr17Ni14Mo2, ect.)
Alloy Steel: A234WP12,A234WP11,A234WP22,A234WP5,A420WPL6,A420WPL3
DINCarbon steel: St37.0,St35.8,St45.8
Stainless steel: 1.4301,1.4306,1.4401,1.4571
Alloy steel: 1.7335,1.7380,1.0488(1.0566)
JISCarbon steel: PG370,PT410
Stainless stee: SUS304,SUS304L,SUS316,SUS316L,SUS321
Alloy steel: PA22,PA23,PA24,PA25,PL380
GB10#,20#,20G,23g,20R,Q235,16Mn, 16MnR,1Cr5Mo,12CrMo, 12CrMoG, 12Cr1Mo
StandardASME,ANSI B16.9; DIN2605,2615,2616,2617,JIS B2311 ,2312,2313; EN 10253-1 ,EN 10253-2
ApplicationPetroleum, chemical, power, gas, metallurgy, shipbuilding, construction, water and nuclear power
PressureSch5--Sch160,XXS
ShapeEqual, round
TechnicsForged

Product Show

Why Choose Us?

1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products export to Africa, Oceania, mid east, eastern Asia, Western Europe etc.


Packing & Shipping

Packaging Details: Pallet/Wooden Case or as per your Specification


Delivery Detail: Shipped in 30 days after payment


FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.


Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 50% T/T in advance ,balance before shippment.

China Socket Welding Equal Tee 316/304 Stainless Steel Forged Fittings Tee Pipe Fittings supplier

Socket Welding Equal Tee 316/304 Stainless Steel Forged Fittings Tee Pipe Fittings

Inquiry Cart 0